- [1] Central Artery/Tunnel Project: Standardized precast, prestressed transition structures PCI JOURNAL, 2001, 46 (01): : 22 - 27
- [2] The breach problems in the tunnels of the Boston Central Artery/Tunnel Project (Big Dig) Soils and Rocks, 2007, 30 (03): : 163 - 167
- [4] Central artery/tunnel project: Innovative use of precast segmental technology PCI JOURNAL, 2000, 45 (04): : 44 - +
- [5] THE BIG DIG CONTINUES + THE MAJOR HIGHWAY CONSTRUCTION PROJECT IN-PROGRESS IN BOSTON, THE SO-CALLED CENTRAL-ARTERY/TUNNEL-PROJECT SPAZIO E SOCIETA-SPACE & SOCIETY, 1996, 18 (73): : 32 - 49
- [6] Dewatering effects on structures adjacent to central artery/tunnel project GEOTECHNICAL ENGINEERING FOR TRANSPORTATION PROJECTS, VOL 2, 2004, (126): : 1524 - 1533
- [7] Boston's money pit (Federal and State officials outraged at the price tag for the "Big Dig", Boston's Central-Artery/Tunnel project) ARCHITECTURE, 2000, 89 (04): : 23 - 24
- [8] KYLESKU BRIDGE IN SCOTLAND: A PRESTRESSED CONCRETE DECK WITH A PARTIALLY PRECAST CENTRAL SPAN. Industria Italiana del Cemento, 1987, 57 (7-8): : 458 - 471
- [10] The central artery/tunnel project preservation program Historical Archaeology, 1998, 32 : 11 - 18