Safety Monitoring of Bearing Replacement for a Concrete High-Speed Railway Bridge Based on Acoustic Emission

被引:9
|
作者
Ma, Fengbo [1 ]
Cheng, Xiaoxiang [1 ]
Zhu, Xiangyi [2 ]
Wu, Gang [1 ]
Feng, De-Cheng [1 ]
Hou, Shitong [3 ]
Kang, Xuecheng [4 ]
机构
[1] Southeast Univ, Key Lab Concrete & Prestressed Concrete Struct, Minist Educ, Nanjing 211189, Peoples R China
[2] Hohai Univ, Coll Water Conservancy & Hydropower Engn, Nanjing 210098, Peoples R China
[3] Southeast Univ, Natl & Local Joint Engn Res Ctr Intelligent Const, Nanjing 211189, Peoples R China
[4] Beijing Texida Technol Co Ltd, 1 Anwai Waiguan Xiejie, Beijing 100011, Peoples R China
关键词
Bridge bearing; High-speed railway; Bearing replacement; Safety monitoring; Acoustic emission (AE); CONSTRUCTION; DIAGNOSIS; AID;
D O I
10.1061/(ASCE)CF.1943-5509.0001719
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
As an important part of a bridge, bearings easily suffer damage when exposed to various loading and environmental changes during their lifetime. Bearing replacement should be performed in a timely manner if damage occurs to high-speed railway (HSR) bridges. The unique structural form and strict operation requirements mean that bearing replacements of HSR bridges are much more difficult than those of highway bridges. However, compared with bearing replacements of highway bridges, far fewer scientific and engineering studies have been conducted to guide the bearing replacement of HSR bridges. In this paper, based on a three-span continuous concrete box girder HSR bridge, an innovative bearing replacement method using reverse disassembly and assembly techniques is proposed and was implemented at a location under operating HSRs. In addition, safety monitoring measures were undertaken to guarantee the safety of the bridge during bearing replacement. In contrast to the usual monitoring practice focusing on the displacement and the external strain of the structure, this monitoring work adopted the acoustic emission (AE) detection technique to explore the internal structural damage formed in the process of construction. The results suggest that the proposed bearing replacement method, which requires the girder to be jacked up by no more than 9 mm, is a promising practice for this complicated construction, and the start time and evolution of damage in the concrete of a bridge during construction can be captured accurately by AE detection with a parameter-based analysis method. All practices presented in this case study can guide future bearing replacements in similar projects.
引用
收藏
页数:10
相关论文
共 50 条
  • [31] Safety threshold of high-speed railway pier settlement based on train-track-bridge dynamic interaction
    CHEN Zhao Wei
    ZHAI Wan Ming
    CAI Cheng Biao
    SUN Yu
    Science China(Technological Sciences), 2015, 58 (02) : 202 - 210
  • [32] Safety threshold of high-speed railway pier settlement based on train-track-bridge dynamic interaction
    ZhaoWei Chen
    WanMing Zhai
    ChengBiao Cai
    Yu Sun
    Science China Technological Sciences, 2015, 58 : 202 - 210
  • [33] Safety threshold of high-speed railway pier settlement based on train-track-bridge dynamic interaction
    CHEN Zhao Wei
    ZHAI Wan Ming
    CAI Cheng Biao
    SUN Yu
    Science China(Technological Sciences), 2015, (02) : 202 - 210
  • [34] Safety threshold of high-speed railway pier settlement based on train-track-bridge dynamic interaction
    Chen ZhaoWei
    Zhai WanMing
    Cai ChengBiao
    Sun Yu
    SCIENCE CHINA-TECHNOLOGICAL SCIENCES, 2015, 58 (02) : 202 - 210
  • [35] A PHM system for bridge monitoring on high speed railway
    Jiang, Xin
    Zhao, Xinxin
    Hu, Suoling
    2017 INTERNATIONAL CONFERENCE ON SENSING, DIAGNOSTICS, PROGNOSTICS, AND CONTROL (SDPC), 2017, : 371 - 376
  • [36] Construction Technologies of a Solid-Web Reinforced Concrete Arch Bridge for High-Speed Railway
    Yu, Xiangdong
    Du, He
    Jing, Haiquan
    STRUCTURAL ENGINEERING INTERNATIONAL, 2020, 30 (02) : 280 - 286
  • [37] Behavior of composite multi-girder and concrete slab of railway bridge for high-speed trains
    Sieffert, Y
    Michel, G
    Martin, D
    Keller, D
    Jullien, J
    8TH INTERNATIONAL CONFERENCE ON MODERN BUILDING MATERIALS, STRUCTURES AND TECHNIQUES, 2004, : 627 - 632
  • [38] Deformation Control Limits for Long-Span Concrete Arch Bridge of High-Speed Railway
    Zheng X.
    Xu X.
    Chen K.
    You L.
    Zhongguo Tiedao Kexue/China Railway Science, 2019, 40 (03): : 60 - 64
  • [39] HIGH-SPEED RAILWAY BRIDGE VIBRATION MEASUREMENT AND ANALYSIS BASED ON RADAR INTERFEROMETRY
    Shao, Zelong
    Zhang, Xiangkun
    Ren, Jiawei
    Li, Yingsong
    IGARSS 2018 - 2018 IEEE INTERNATIONAL GEOSCIENCE AND REMOTE SENSING SYMPOSIUM, 2018, : 4099 - 4102
  • [40] Evaluation of High-Speed Railway Bridges Based on a Nondestructive Monitoring System
    Kaloop, Mosbeh R.
    Hu, Jong Wan
    Elbeltagi, Emad
    APPLIED SCIENCES-BASEL, 2016, 6 (01):