Risk Factors of Post-earthquake Fire for Constructions Using the Analytic Hierarchy Process Approach

被引:0
|
作者
Lin, Hsiaomei [1 ]
Lin, Chingyuan [1 ]
Ko, Juicheng [2 ]
Wu, Yushiang [3 ]
机构
[1] Natl Taiwan Univ Sci & Technol, Dept Architecture, Taipei, Taiwan
[2] Guo An Fire Protect Engn Co Ltd, Taipei, Taiwan
[3] China Univ Sci & Technol, Dept Mech Engn, Taipei, Taiwan
关键词
post-earthquake fire; risk factors; analytic hierarchy process (AHP); EARTHQUAKE; CHRISTCHURCH;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Urban area is always gathering huge population and different kinds of activities. Once there is any disaster, it would be very possible to have unrecoverable damage. For the post-earthquake fire in constructions, it would caucus damage not only in civilians' lives but also property. Therefore, it becomes an important issue for reducing the damage and casualties in post-earthquake fires. By considering the factors and managing execution for post-earthquake fire in constructions, this research is collecting the statistical data about the experts' opinion, then using Analytic Hierarchy Process (AHP) to analyze, and finalizing the construction of potential risk factors in post-earthquake fires. The five indicators after weighted in all the dimensions are "Well installation of automatic sprinkler equipment", "The application of flame retardant materials", "Unbroken structure of planning fire preventing zone", "Closing of fire doors", and "Execution of fire preventing management". The study result is very close to the potential risk factors of post-earthquake fire from current studies. It shows the relevant factors and the weight constructed by this research are compliant with current situation.
引用
收藏
页码:1 / 4
页数:4
相关论文
共 50 条
  • [21] Protection of Cultural Heritage from Post-Earthquake Fire
    Toki, Kenzo
    JOURNAL OF DISASTER RESEARCH, 2011, 6 (01) : 4 - 10
  • [22] Steel Connections Post-Earthquake Fire Tests Setup
    Petrina, Tudor
    WORLD MULTIDISCIPLINARY CIVIL ENGINEERING-ARCHITECTURE-URBAN PLANNING SYMPOSIUM 2016, WMCAUS 2016, 2016, 161 : 133 - 136
  • [23] An evaluation method for the urban post-earthquake fire risk considering multiple scenarios of fire spread and evacuation
    Nishino, Tomoaki
    Tanaka, Takeyoshi
    Hokugo, Akihiko
    FIRE SAFETY JOURNAL, 2012, 54 : 167 - 180
  • [24] Cellular automata modeling of fire spread based on post-earthquake fire risk assessment of urban area
    Meng Xiaojing
    Zhao Jiangping
    ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 732 - 738
  • [25] Analytical Hierarchy Process Based Post-earthquake Health Diagnosis Method for Tunnel in South of China
    Huang, Hao
    Zhang, Wei
    Yang, LuFeng
    Chen, Zhen
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 991 - +
  • [26] CRM FACTORS ASSESSMENT USING ANALYTIC HIERARCHY PROCESS
    Zajarosova, Marketa
    2ND INTERNATIONAL CONFERENCE ON EDUCATION AND SOCIAL SCIENCES (INTCESS'15), 2015, : 641 - 647
  • [27] PROJECT RISK ASSESSMENT USING THE ANALYTIC HIERARCHY PROCESS
    MUSTAFA, MA
    ALBAHAR, JF
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 1991, 38 (01) : 46 - 52
  • [28] An approach to collaborative design using analytic hierarchy process
    Ito, T
    1998 JAPAN-U.S.A. SYMPOSIUM ON FLEXIBLE AUTOMATION - PROCEEDINGS, VOLS I AND II, 1998, : 875 - 880
  • [29] The time process of post-earthquake recovery: the Yao'an earthquake in China
    Wang, Ying
    Li, Juan
    Chen, Hao
    Zou, Zhenhua
    DISASTERS, 2014, 38 (04) : 774 - 789
  • [30] Risk assessment influencing factors for Arabian construction projects using analytic hierarchy process
    Eskander, Remon Fayek Aziz
    ALEXANDRIA ENGINEERING JOURNAL, 2018, 57 (04) : 4207 - 4218