Optimization of open-pit mine depressurization system I using simulated annealing technique

被引:5
|
作者
Mohan, S. [1 ]
Sreejith, P. K. [1 ]
Pramada, S. K. [1 ]
机构
[1] Indian Inst Technol, Dept Civil Engn, Environm & Water Resources Engn Div, Madras 600036, Tamil Nadu, India
来源
JOURNAL OF HYDRAULIC ENGINEERING-ASCE | 2007年 / 133卷 / 07期
关键词
D O I
10.1061/(ASCE)0733-9429(2007)133:7(825)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Opencast mines operating in an area with dominant groundwater features may face hydrology-related problems such as heaving and bursting of the mine floor due to excessive uplift pressure. A proper groundwater control system has to be implemented to solve these problems. But the groundwater control system, which includes dewatering and depressurization wells may also create impacts on local groundwater flows. Therefore, an optimization-based development of the groundwater control system is required to ensure that local and regional hydrogeological impacts are within acceptable limits. This note presents a case study where an optimization program based on the simulated annealing technique was developed and applied to a three-dimensional seven-layer groundwater model. The calibrated groundwater flow model, which is based on MODFLOW, was used as the simulation component in the! linked simulation-optimization model. The combined model was then used to identify the optimum depressurization strategy. The results show that this combined simulation and optimization methodology is a viable approach for solving large-scale groundwater management problems.
引用
收藏
页码:825 / 830
页数:6
相关论文
共 50 条
  • [41] CUTOFFS GRADE CALCULATION FOR THE OPEN-PIT MINE
    JOHN, T
    CIM BULLETIN, 1984, 77 (863): : 91 - 91
  • [42] SLOPE DESIGN OF AN OPEN-PIT COPPER MINE
    SINGH, VK
    BALIGA, BD
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES & GEOMECHANICS ABSTRACTS, 1994, 31 (01) : 55 - 69
  • [43] Update on open-pit coal mine blasting
    Adhikari, G.R.
    Gupta, R.N.
    Singh, R.B.
    Journal of Mines, Metals and Fuels, 1987, 35 (06): : 219 - 222
  • [44] OPEN-PIT MINE AT ASBESTOS-HILL
    ROUSSIN, R
    CIM BULLETIN, 1976, 69 (775): : 70 - 74
  • [45] OPTIMISING THE OPERATIONAL ENERGY EFFICIENCY OF AN OPEN-PIT COAL MINE SYSTEM
    Patterson, Samuel
    BULLETIN OF THE AUSTRALIAN MATHEMATICAL SOCIETY, 2017, 95 (01) : 174 - 176
  • [46] Computer-aided mine planning for an open-pit mine
    Solanki, M.K.S.
    Kanodia, H.K.
    Journal of the Institution of Engineers (India), Part MI: Mining Engineering Division, 1990, 71 (02):
  • [47] Study on Complexity Planning Model of Pumped Storage in Abandoned Open-Pit Mine: A Case Study of Fushun Open-Pit Mine
    Luo, Pingjia
    Han, Xueqi
    Chen, Ning
    FRONTIERS IN EARTH SCIENCE, 2022, 10
  • [48] GA-based Resource Transportation Scheduling Optimization of Open-pit Mine
    He Miao
    Zhou Jinsheng
    Nie Dexin
    2017 INTERNATIONAL CONFERENCE ON SMART GRID AND ELECTRICAL AUTOMATION (ICSGEA), 2017, : 247 - 250
  • [49] Optimization model of GNSS/pseudolites structure design for open-pit mine positioning
    Shan, Zheng-ying
    Han, Hou-zeng
    Jiang, Kun
    TRANSACTIONS OF NONFERROUS METALS SOCIETY OF CHINA, 2013, 23 (07) : 2201 - 2208
  • [50] Predicting open-pit mine production using machine learning techniques
    Kumah, Faustin N.
    Saim, Alex K.
    Oppong, Millicent N.
    Arthur, Clement K.