Optimization of open-pit mine depressurization system I using simulated annealing technique

被引:5
|
作者
Mohan, S. [1 ]
Sreejith, P. K. [1 ]
Pramada, S. K. [1 ]
机构
[1] Indian Inst Technol, Dept Civil Engn, Environm & Water Resources Engn Div, Madras 600036, Tamil Nadu, India
来源
JOURNAL OF HYDRAULIC ENGINEERING-ASCE | 2007年 / 133卷 / 07期
关键词
D O I
10.1061/(ASCE)0733-9429(2007)133:7(825)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Opencast mines operating in an area with dominant groundwater features may face hydrology-related problems such as heaving and bursting of the mine floor due to excessive uplift pressure. A proper groundwater control system has to be implemented to solve these problems. But the groundwater control system, which includes dewatering and depressurization wells may also create impacts on local groundwater flows. Therefore, an optimization-based development of the groundwater control system is required to ensure that local and regional hydrogeological impacts are within acceptable limits. This note presents a case study where an optimization program based on the simulated annealing technique was developed and applied to a three-dimensional seven-layer groundwater model. The calibrated groundwater flow model, which is based on MODFLOW, was used as the simulation component in the! linked simulation-optimization model. The combined model was then used to identify the optimum depressurization strategy. The results show that this combined simulation and optimization methodology is a viable approach for solving large-scale groundwater management problems.
引用
收藏
页码:825 / 830
页数:6
相关论文
共 50 条
  • [1] OPTIMIZATION OF AN OPEN-PIT MINE TRANSPORT-SYSTEM
    TENIC, A
    KORDIC, Z
    STROJARSTVO, 1981, 23 (06): : 321 - 329
  • [2] Open-Pit Mine Optimization with Maximum Satisfiability
    Matthew Deutsch
    Mining, Metallurgy & Exploration, 2019, 36 : 757 - 764
  • [3] Open-Pit Mine Optimization with Maximum Satisfiability
    Deutsch, Matthew
    MINING METALLURGY & EXPLORATION, 2019, 36 (04) : 757 - 764
  • [5] Production schedule optimization in open-pit coal mine
    Gu, Xiao-Wei
    Xu, Xiao-Chuan
    Wang, Qing
    Zheng, You-Yi
    Dongbei Daxue Xuebao/Journal of Northeastern University, 2013, 34 (08): : 1184 - 1187
  • [6] Ultimate pit optimization with environmental problem for open-pit coal mine
    Xu, Xiaochuan
    Gu, Xiaowei
    Wang, Qing
    Zhao, Yunqi
    Zhu, Zhenguo
    Wang, Fengdan
    Zhang, Zaolin
    PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, 2023, 173 : 366 - 372
  • [7] Modeling the dewatering and depressurization of the Lihir open-pit gold mine, Papua New Guinea
    White, SP
    Creighton, AL
    Bixley, PE
    Kissling, WM
    GEOTHERMICS, 2004, 33 (04) : 443 - 456
  • [8] The Influence of Rainfall on Landslide Stability of an Open-Pit Mine: The Case of Haizhou Open-Pit Mine
    An Bo
    Zhu Chun
    Liu Kuiming
    Li Sitong
    Tao Zhigang
    Li Haipeng
    Yu Haoran
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2019, 37 (04) : 3367 - 3378
  • [9] The Influence of Rainfall on Landslide Stability of an Open-Pit Mine: The Case of Haizhou Open-Pit Mine
    An Bo
    Zhu Chun
    Liu Kuiming
    Li Sitong
    Tao Zhigang
    Li Haipeng
    Yu Haoran
    Geotechnical and Geological Engineering, 2019, 37 : 3367 - 3378
  • [10] Study on Optimization of Coal Truck Flow in Open-Pit Mine
    Bao, Haiming
    Zhang, Ruixin
    ADVANCES IN CIVIL ENGINEERING, 2020, 2020