共 50 条
- [11] First results from bent crystal extraction at the Fermilab Tevatron NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION B-BEAM INTERACTIONS WITH MATERIALS AND ATOMS, 1996, 119 (1-2): : 231 - 238
- [13] The Run 2 DO Muon system at the fermilab tevatron ADVANCED TECHNOLOGY AND PARTICLE PHYSICS, PROCEEDINGS, 2002, 1 : 352 - 356
- [15] SUSY searches at the Tevatron latest Run I results, prospects for Run II ACTA PHYSICA POLONICA B, 2002, 33 (11): : 3887 - 3891