Long-term scheduling of large cascade hydropower stations in Jinsha River, China

被引:54
|
作者
Wang, Chao
Zhou, Jianzhong [1 ]
Lu, Peng
Yuan, Liu
机构
[1] Huazhong Univ Sci & Technol, Sch Hydropower & Informat Engn, Wuhan 430074, Hubei, Peoples R China
基金
中国国家自然科学基金;
关键词
Large hydropower stations; Long term scheduling; Ant colony optimization; Compensation analysis; ANT COLONY OPTIMIZATION; HYBRID DIFFERENTIAL EVOLUTION; ECONOMIC-DISPATCH; PROGRESSIVE OPTIMALITY; ALGORITHM; OPERATION; SYSTEMS; PLANTS; GENERATION; MODEL;
D O I
10.1016/j.enconman.2014.11.024
中图分类号
O414.1 [热力学];
学科分类号
摘要
The Jinsha River is the third longest river in the world. It consists of four large hydropower stations with total installed capacity 42,960 MW lying on the upper stretches of the Yangtze River, which is the longest river in the word. Due to the great potential of large cascade hydropower stations on power generation, long-term scheduling of large cascade hydropower stations (LSLCHS) plays an important role in electrical power system. As more and more concentrations focused on the optimal operation of large cascade hydropower stations, the LSLCHS has been taken into a multi-dimensional, non-convex and non-linear optimization problem due to its complicated hydraulic connection relationships and varieties of complex constraints with considering its power generation, shipping and ecological characteristics. In order to solve this problem, a multi-population ant colony optimization for continuous domain (MACO(R)) is proposed in this paper. A Gaussian group selection strategy is applied to overcome premature convergence and ants with different characteristics are employed to enhance search ability, and circulatory solution correction strategy is presented to handle outflow, water level and output constraints. Furthermore, the efficiency and stability of MACO(R) are verified by its more desirable results in comparison to other latest works in numerical simulation, and it can be a viable alternative for solving those complicated optimal problems. With the applications in hydropower operation, LSLCHS can obtain more power generation benefit than other alternatives in dry, normal and wet year, and the compensation analysis reveals that joint operation of cascade hydropowerstations can enhance the total power generation especially in wet season. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:476 / 487
页数:12
相关论文
共 50 条
  • [31] Long-Term Scheduling of Provincial Power Grid With Rich Hydropower
    Cao, Rui
    Shen, Jian-Jian
    Chen, Fu
    Cheng, Chun-Tian
    Wang, Jian
    WORLD ENVIRONMENTAL AND WATER RESOURCES CONGRESS 2017: INTERNATIONAL PERSPECTIVES, HISTORY AND HERITAGE, EMERGING TECHNOLOGIES, AND STUDENT PAPERS, 2017, : 476 - 489
  • [32] Short-term power generation scheduling rules for cascade hydropower stations based on hybrid algorithm
    Xie, Wei
    Ji, Chang-ming
    Yang, Zi-jun
    Zhang, Xiao-xing
    WATER SCIENCE AND ENGINEERING, 2012, 5 (01) : 46 - 58
  • [33] Long-Term Hydropower Generation Scheduling of Large-Scale Cascade Reservoirs Using Chaotic Adaptive Multi-Objective Bat Algorithm
    Su, Lyuwen
    Yang, Kan
    Hu, Hu
    Yang, Zhe
    WATER, 2019, 11 (11)
  • [34] Mid-term scheduling and trading decisions for cascade hydropower stations considering multiple variable uncertainties
    Lu, Jia
    Liu, Yaxin
    Cao, Hui
    Xu, Yang
    Ma, Haoyu
    Zhang, Zheng
    Wang, Tao
    Yang, Yuqi
    FRONTIERS IN ENERGY RESEARCH, 2023, 11
  • [36] Long-Term Bidding Scheduling of a Price-Maker Cascade Hydropower Station Based on Supply Function Equilibrium
    Liu, Gang
    Ma, Guangwen
    Huang, Weibin
    Chen, Shijun
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2022, 2022
  • [37] Long-Term Bidding Scheduling of a Price-Maker Cascade Hydropower Station Based on Supply Function Equilibrium
    Liu, Gang
    Ma, Guangwen
    Huang, Weibin
    Chen, Shijun
    Mathematical Problems in Engineering, 2022, 2022
  • [38] Optimization Scheduling of Cascade Hydropower Stations in Energy Conservation and Emission Reduction
    Li, Ze Hong
    THERMAL, POWER AND ELECTRICAL ENGINEERING, PTS 1 AND 2, 2013, 732-733 : 1385 - 1389
  • [39] Short-term scheduling methods for peak load responding demand of cascade hydropower stations in small and medium-sized river basins
    Cheng X.
    Chen Q.
    Li X.
    Peng H.
    Zhong H.
    Li W.
    Shuili Xuebao/Journal of Hydraulic Engineering, 2023, 54 (02): : 159 - 171
  • [40] Study on Optimized Scheduling of Cascade Hydropower Stations in Medium and Small Basins
    Li Yifan
    Wang Dekuan
    Yuan, Shi
    PROCEEDINGS OF THE 35TH IAHR WORLD CONGRESS, VOLS III AND IV, 2013, : 8721 - 8727