Cyclical schedules for the joint replenishment problem with dynamic demands

被引:0
|
作者
Webb, IR
Buzby, BR
Campbell, GM
机构
[1] UNIV CONNECTICUT,SCH BUSINESS ADM,DEPT OPERAT & INFORMAT MANAGEMENT,STORRS,CT 06269
[2] RELATED SERV CO INC,AMER EXPRESS TRAVEL,WORLD FINANCIAL CTR,NEW YORK,NY 10285
关键词
D O I
10.1002/(SICI)1520-6750(199709)44:6<577::AID-NAV4>3.0.CO;2-0
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
The Joint Replenishment Problem (JRP) involves production planning for a family of items. The items have a coordinated cost structure whereby a major setup cost is incurred whenever any item in the family is produced, and an item-specific minor setup cost is incurred whenever that item is produced. This paper investigates the performance of two types of cyclical production schedules for the SRP with dynamic demands over a finite planning horizon. The cyclical schedules considered are: (i) general cyclical schedules-schedules where the number of periods between successive production runs for any item is constant over the planning horizon-and (2) power-of-two schedules -a subset of cyclical schedules for which the number of periods between successive setups must be a power of 2. The paper evaluates the additional cost incurred by requiring schedules to be cyclical, and identifies problem characteristics that have a significant effect on this additional cost. (C) 1997 John Wiley & Sons, Inc.
引用
收藏
页码:577 / 589
页数:13
相关论文
共 50 条
  • [21] The joint replenishment problem with resource restriction
    Moon, IK
    Cha, BC
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 173 (01) : 190 - 198
  • [22] APPROXIMATING THE JOINT REPLENISHMENT PROBLEM WITH DEADLINES
    Nonner, Tim
    Souza, Alexander
    DISCRETE MATHEMATICS ALGORITHMS AND APPLICATIONS, 2009, 1 (02) : 153 - 173
  • [23] The joint replenishment problem with trade credits
    Lin, Jen-Yen
    Yao, Ming-Jong
    JOURNAL OF GLOBAL OPTIMIZATION, 2020, 76 (02) : 347 - 382
  • [24] THE JOINT REPLENISHMENT PROBLEM WITH GENERAL JOINT COST STRUCTURES
    FEDERGRUEN, A
    ZHENG, YS
    OPERATIONS RESEARCH, 1992, 40 (02) : 384 - 403
  • [25] THE JOINT REPLENISHMENT PROBLEM WITH TIME-VARYING COSTS AND DEMANDS - EFFICIENT, ASYMPTOTIC AND EPSILON-OPTIMAL SOLUTIONS
    FEDERGRUEN, A
    TZUR, M
    OPERATIONS RESEARCH, 1994, 42 (06) : 1067 - 1086
  • [26] The joint replenishment problem with variable production costs
    Bayindir, Z. P.
    Birbil, S. I.
    Frenk, J. B. G.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 175 (01) : 622 - 640
  • [27] Joint Replenishment Problem with Resource Restriction: A Note
    Wahab, M. I. M.
    Chen, Y.
    2018 5TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND APPLICATIONS (ICIEA), 2018, : 345 - 348
  • [28] Discounted costs and obsolescence with the Joint replenishment problem
    Afonso, Ricardo
    Godinho, Pedro
    Costa, Joao Paulo
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2022, 13 (01) : 51 - 66
  • [29] Joint replenishment problem with fuzzy resource constraint
    School of Computer Science and Engineering, Harbin Institute of Technology, Harbin 150001, China
    Jisuanji Jicheng Zhizao Xitong, 2008, 1 (113-117):
  • [30] Approximation Algorithms for the Joint Replenishment Problem with Deadlines
    Bienkowski, Marcin
    Byrka, Jaroslaw
    Chrobak, Marek
    Dobbs, Neil
    Nowicki, Tomasz
    Sviridenko, Maxim
    Swirszcz, Grzegorz
    Young, Neal E.
    AUTOMATA, LANGUAGES, AND PROGRAMMING, PT I, 2013, 7965 : 135 - 147