The Joint Replenishment Problem (JRP) involves production planning for a family of items. The items have a coordinated cost structure whereby a major setup cost is incurred whenever any item in the family is produced, and an item-specific minor setup cost is incurred whenever that item is produced. This paper investigates the performance of two types of cyclical production schedules for the SRP with dynamic demands over a finite planning horizon. The cyclical schedules considered are: (i) general cyclical schedules-schedules where the number of periods between successive production runs for any item is constant over the planning horizon-and (2) power-of-two schedules -a subset of cyclical schedules for which the number of periods between successive setups must be a power of 2. The paper evaluates the additional cost incurred by requiring schedules to be cyclical, and identifies problem characteristics that have a significant effect on this additional cost. (C) 1997 John Wiley & Sons, Inc.
机构:
Cornell Univ, Sch Operat Res & Informat Engn, Ithaca, NY USACornell Univ, Sch Operat Res & Informat Engn, Ithaca, NY USA
Cheung, Maurice
Elmachtoub, Adam N.
论文数: 0引用数: 0
h-index: 0
机构:
Columbia Univ, Dept Ind Engn & Operat Res, New York, NY 10027 USACornell Univ, Sch Operat Res & Informat Engn, Ithaca, NY USA
Elmachtoub, Adam N.
Levi, Retsef
论文数: 0引用数: 0
h-index: 0
机构:
MIT, Alfred P Sloan Sch Management, Cambridge, MA 02139 USACornell Univ, Sch Operat Res & Informat Engn, Ithaca, NY USA
Levi, Retsef
Shmoys, David B.
论文数: 0引用数: 0
h-index: 0
机构:
Cornell Univ, Dept Comp Sci, Ithaca, NY 14853 USA
Cornell Univ, Sch Operat Res & Informat Engn, Ithaca, NY USACornell Univ, Sch Operat Res & Informat Engn, Ithaca, NY USA