Non-conventional reliable AC transmission systems for power delivery at long and very long distance

被引:0
|
作者
Samorodov, G [1 ]
Krasilnikova, T [1 ]
Dikoy, V [1 ]
Zilberman, S [1 ]
Iatsenko, R [1 ]
机构
[1] Siberian Res Inst Power Engn, Novosibirsk, Russia
关键词
economic efficiency; four-phase transmission line; long and very long distance; reliability; reserve phase; transmission system; two-phase conditions;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
All over the world there are large and very economical hydroelectric resources, which are located at long (500-1500 km) and very long (2000 - 4000km) distance from load areas. To secure required level of reliability, transmission systems for power delivery from hydroelectric stations must meet the criterion (n-1), i.e. transmitted power doesn't have to decrease in case of emergency opening of any circuit sections. Application of double or triple-circuit interlinked transmission systems is traditional decision for realizability of this criterion. But frequently reliability condition does not allow to implement the most economical variant, for example to make use of 1150 kV single-circuit transmission system instead of 750 kV triple-circuit one. It is considered in the capacity of feasible variants for solution of reliability problem as follows: triple-circuit interlinked transmission systems; single-circuit transmission systems with spare phase; single-circuit four-phase transmission systems; single-circuit transmission systems with realization of two-phase long-duration conditions. The following aspects are discussed and analyzed: general review of variants for long and very long distance transmission; their scheme and conditions; comparison of their reliability and techno-economical characteristics.
引用
收藏
页码:982 / 987
页数:6
相关论文
共 50 条
  • [21] Extra Long-Distance Bulk Power Transmission
    Lima, Antonio
    Dias, Robson
    2012 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING, 2012,
  • [22] Extra Long-Distance Bulk Power Transmission
    Dias, Robson
    Lima, Antonio
    Portela, Carlos
    Aredes, Mauricio
    IEEE TRANSACTIONS ON POWER DELIVERY, 2011, 26 (03) : 1440 - 1448
  • [23] Long-Distance DC Electrical Power Transmission
    Liu, Rongsheng
    IEEE ELECTRICAL INSULATION MAGAZINE, 2013, 29 (05) : 37 - 46
  • [24] Long term energy efficiency of non-conventional building systems: Use of Polyblocks in improving thermal performance
    Tshilombo, D. M.
    Alabi, S. A.
    Mahachi, J.
    CURRENT PERSPECTIVES AND NEW DIRECTIONS IN MECHANICS, MODELLING AND DESIGN OF STRUCTURAL SYSTEMS, 2022, : 1403 - 1408
  • [25] Widening the Bottleneck: Increasing the Utilisation of Long Distance AC Transmission Corridors
    Barker, C. D.
    Kirby, N. M.
    MacLeod, N. M.
    Whitehouse, R. S.
    2010 IEEE PES TRANSMISSION AND DISTRIBUTION CONFERENCE AND EXPOSITION: SMART SOLUTIONS FOR A CHANGING WORLD, 2010,
  • [26] Long term energy efficiency of non-conventional building systems: Use of Polyblocks in improving thermal performance
    Tshilombo, D. M.
    Alabi, S. A.
    Mahachi, J.
    CURRENT PERSPECTIVES AND NEW DIRECTIONS IN MECHANICS, MODELLING AND DESIGN OF STRUCTURAL SYSTEMS, 2022, : 485 - 486
  • [27] Methodology to perform a non-conventional evaluation of cooling, heating, and power systems
    Mago, P. J.
    Fumo, N.
    Chamra, L. M.
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART A-JOURNAL OF POWER AND ENERGY, 2007, 221 (A8) : 1075 - 1087
  • [28] Static series compensators applied to very long distance transmission lines
    Aredes, M
    Portela, C
    van Emmerik, EL
    Dias, RFD
    ELECTRICAL ENGINEERING, 2004, 86 (02) : 69 - 76
  • [30] Fiber designs with significantly reduced nonlinearity for very long distance transmission
    Hattori, HT
    Safaai-Jazi, A
    APPLIED OPTICS, 1998, 37 (15): : 3190 - 3197