A mathematical model for transporting the biomass to biomass based power plant

被引:41
|
作者
Singh, Jagtar [1 ]
Panesar, B. S.
Sharma, S. K. [2 ]
机构
[1] SLIET Longowal, Dept Mech Engn, Longowal, Punjab, India
[2] NIT Kurukshetra, Dept Mech Engn, Kurukshetra, Haryana, India
来源
BIOMASS & BIOENERGY | 2010年 / 34卷 / 04期
关键词
Baled biomass; Briquetted biomass; Spatially scattered; Energy; Transport systems; Collection cost and modeling etc mathematical; SYSTEM; BEHAVIOR; ENERGY;
D O I
10.1016/j.biombioe.2009.12.012
中图分类号
S2 [农业工程];
学科分类号
0828 ;
摘要
In Punjab, million of tons of agricultural biomass are being generated every year, but it is spatially scattered. The spatial distribution of this resource and the associated costs on collection and transportation are the major bottleneck in the success of biomass energy-conversion facilities. This paper deals with the mathematical model for collection and transporting the biomass from fields to biomass based power plant. The unit transport cost was calculated by using this model. Four systems of transport were conceptualized for two transport modes (tractor with wagon and truck). Three types of agricultural biomass (loose, baled and briquetted) were considered for transport analysis. For all modes of transport, it was observed that unit cost of transport decreases with increase in distance. The transport cost was least for briquetted biomass as compared to loose and baled biomass. (C) 2009 Elsevier Ltd. All rights reserved.
引用
收藏
页码:483 / 488
页数:6
相关论文
共 50 条
  • [21] Designing of Biomass Based Power Plant for Residential Building Energy System
    Rahman, Hafezur
    Sharif, Md Rayhan
    Ahmed, Rifayat
    Nijam, Tamzid
    Shoeb, Md. Asaduzzaman
    2ND INTERNATIONAL CONFERENCE ON ELECTRICAL ENGINEERING AND INFORMATION COMMUNICATION TECHNOLOGY (ICEEICT 2015), 2015,
  • [22] Possibilities for biomass-based power plant and wind system integration
    Jurado, F
    Saenz, JR
    ENERGY, 2002, 27 (10) : 955 - 966
  • [23] Forest biomass power plant installation scenarios
    Teixeira, Thaisa Ribeiro
    Alvares Soares Ribeiro, Carlos Antonio
    dos Santos, Alexandre Rosa
    Marcatti, Gustavo Eduardo
    Lorenzon, Alexandre Simoes
    Martins de Castro, Nero Lemos
    Domingues, Getulio Fonseca
    Leite, Helio Garcia
    Martins da Costa de Menezes, Sady Junior
    Santos Mota, Pedro Henrique
    de Almeida Telles, Lucas Arthur
    Vieira, Renato da Silva
    BIOMASS & BIOENERGY, 2018, 108 : 35 - 47
  • [24] Sale could rekindle biomass power plant
    不详
    PROFESSIONAL ENGINEERING, 2002, 15 (19) : 15 - 15
  • [25] ENERGY AND EXERGY ANALYSIS OF A BIOMASS POWER PLANT
    Silva, Joao
    Teixeira, Senhorinha F.
    Preziati, Simone
    Teixeira, Jose Carlos
    PROCEEDINGS OF THE ASME INTERNATIONAL MECHANICAL ENGINEERING CONGRESS AND EXPOSITION, 2016, VOL. 6B, 2017,
  • [26] CONTRACTS FOR BIOMASS POWER PLANT IN SISAK AND OSIJEK
    不详
    GRADEVINAR, 2015, 67 (04): : 417 - 417
  • [27] MGT Power to Develop Biomass Electricity Plant
    不详
    FORESTRY CHRONICLE, 2009, 85 (05): : 689 - 689
  • [28] Fireside and steamside performance in biomass power plant
    Mori, Stefano
    Sumner, Joy
    Bouvet, Justin
    Simms, Nigel J.
    MATERIALS AT HIGH TEMPERATURES, 2022, 39 (02) : 106 - 121
  • [29] Implementation plans for a biomass power plant in Portugal
    Torrado, S
    Lourenço, P
    Galinho, L
    Teixeira, JA
    BIOMASS FOR ENERGY AND INDUSTRY, 1998, : 1223 - 1226
  • [30] Process modelling of a biomass fired power plant
    Modigell, M.
    Liebig, D.
    Weng, M.
    Sundermann, B.
    VDI Berichte, 2003, (1750): : 609 - 614