共 50 条
- [1] Improvement in relining design of No.1 blast furnace at Baoshan Iron and Steel Corp Kang T'ieh/Iron and Steel (Peking), 1998, 33 (03): : 1 - 4
- [2] Hot test study on the stave of No.3 blast furnace at Baoshan Iron and Steel Co Kang T'ieh/Iron and Steel (Peking), 1999, 34 (04): : 4 - 8
- [3] Experience for prolongation of blast furnace campaign life at Wuhan Iron and Steel Corporation 61ST IRONMAKING CONFERENCE PROCEEDINGS, 2002, 61 : 105 - 120
- [6] Practice for Extending Blast Furnace Campaign Life at Wuhan Iron and Steel Corporation Journal of Iron and Steel Research International, 2006, 13 : 1 - 7
- [7] Design of coal grinding system of pulverized coal injection for No.1 blast furnace at Baoshan Iron and Steel Corp Guangdianzi Jiguang/Journal of Optoelectronics Laser, 1998, 9 (05): : 4 - 8
- [8] Design of coal grinding system of pulverized coal injection for No.1 blast furnace at Baoshan Iron and Steel Corp Kang T'ieh/Iron and Steel (Peking), 1998, 33 (09): : 4 - 8
- [9] Coke Saving and productivity raising with new techniques for No.1 blast furnace at Shanghai Baoshan Iron and Steel General Works Kang T'ieh/Iron and Steel (Peking), 1993, 28 (07): : 1 - 4
- [10] Application of Carbon Composite Bricks for Blast Furnace Hearth 6TH INTERNATIONAL SYMPOSIUM ON HIGH-TEMPERATURE METALLURGICAL PROCESSING, 2015, : 595 - 602