Using one filter stage of unsaturated/saturated vertical flow filters for nitrogen removal and footprint reduction of constructed wetlands

被引:12
|
作者
Morvannou, Ania [1 ,3 ]
Troesch, Stephane [1 ]
Esser, Dirk [2 ]
Forquet, Nicolas [3 ]
Petitjean, Alain [1 ]
Molle, Pascal [3 ]
机构
[1] Epur Nat, 12 Rue Toussaint Flechaire, F-84510 Caumont Sur Durance, France
[2] Soc Ingn Nat & Tech, F-73370 Chef Lieu, La Chapelle Du, France
[3] Irstea, Wastewater Treatment Team, Freshwater Syst Ecol & Pollut Res Unit, 5 Rue Doua,CS 70077, F-69626 Villeurbanne, France
关键词
footprint; performance; unsaturated/saturated conditions; vertical flow constructed wetland; SINGLE-STAGE; TREATMENT PERFORMANCES; RECIRCULATION; SEWAGE;
D O I
10.2166/wst.2017.115
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
French vertical flow constructed wetlands (VFCW) treating raw wastewater have been developed successfully over the last 30 years. Nevertheless, the two-stage VFCWs require a total filtration area of 2-2.5 m(2)/P.E. Therefore, implementing a one-stage system in which treatment performances reach standard requirements is of interest. Biho-Filter (R) is one of the solutions developed in France by Epur Nature. Biho-Filter (R) is a vertical flow system with an unsaturated layer at the top and a saturated layer at the bottom. The aim of this study was to assess this new configuration and to optimize its design and operating conditions. The hydraulic functioning and pollutant removal efficiency of three different Biho-Filter (R) plants commissioned between 2011 and 2012 were studied. Outlet concentrations of the most efficient Biho-Filter (R) configuration are 70 mg/L, 15 mg/L, 15 mg/L and 25 mg/L for chemical oxygen demand (COD), 5-day biological oxygen demand (BOD5), total suspended solids (TSS) and total Kjeldahl nitrogen (TKN), respectively. Up to 60% of total nitrogen is removed. Nitrification efficiency is mainly influenced by the height of the unsaturated zone and the recirculation rate. The optimum recirculation rate was found to be 100%. Denitrification in the saturated zone works at best with an influent COD/NO3-N ratio at the inflet of this zone larger than 2 and a hydraulic retention time longer than 0.75 days.
引用
收藏
页码:124 / 133
页数:10
相关论文
共 50 条
  • [21] Comparative study of nitrogen removal and bio-film clogging for three filter media packing strategies in vertical flow constructed wetlands
    Song, Xinshan
    Ding, Yi
    Wang, Yuhui
    Wang, Wei
    Wang, Gang
    Zhou, Bin
    ECOLOGICAL ENGINEERING, 2015, 74 : 1 - 7
  • [22] Investigations on Nitrogen Removal in a Two-Stage Subsurface Vertical Flow Constructed Wetland
    Langergraber, Guenter
    Prandtstetten, Christoph
    Pressl, Alexander
    Sleytr, Kirsten
    Leroch, Klaus
    Rohrhofer, Roland
    Haberl, Raimund
    WASTEWATER TREATMENT, PLANT DYNAMICS AND MANAGEMENT IN CONSTRUCTED AND NATURAL WETLANDS, 2008, : 199 - +
  • [23] Step-feeding ratios affect nitrogen removal and related microbial communities in multi-stage vertical flow constructed wetlands
    Wang, Ying
    Shen, Linya
    Wu, Juan
    Zhong, Fei
    Cheng, Shuiping
    SCIENCE OF THE TOTAL ENVIRONMENT, 2020, 721
  • [24] Determination of the optimal aeration for nitrogen removal in biochar-amended aerated vertical flow constructed wetlands
    Zhou, Xu
    Gao, Lei
    Zhang, Hai
    Wu, Haiming
    BIORESOURCE TECHNOLOGY, 2018, 261 : 461 - 464
  • [25] Nitrogen removal in intermittently aerated vertical flow constructed wetlands: Impact of influent COD/N ratios
    Fan, Jinlin
    Wang, Wengang
    Zhang, Bo
    Guo, Yeye
    Ngo, Huu Hao
    Guo, Wenshan
    Zhang, Jian
    Wu, Haiming
    BIORESOURCE TECHNOLOGY, 2013, 143 : 461 - 466
  • [26] Removal of total nitrogen by Cyperus alternifolius from wastewaters in simulated vertical-flow constructed wetlands
    Cui, Li-Hua
    Ouyang, Ying
    Chen, Yin
    Zhu, Xi-Zhen
    Zhu, Wen-Ling
    ECOLOGICAL ENGINEERING, 2009, 35 (08) : 1271 - 1274
  • [27] Partially Saturated Vertical Constructed Wetlands and Free-Flow Vertical Constructed Wetlands for Pilot-Scale Municipal/Swine Wastewater Treatment Using Heliconia latispatha
    Fernandez Viveros, Jose Antonio
    Martinez-Resendiz, Georgina
    Zurita, Florentina
    Luis Marin-Muniz, Jose
    Lopez Mendez, Maria Cristina
    Zamora, Sergio
    Sandoval Herazo, Luis Carlos
    WATER, 2022, 14 (23)
  • [28] Enhancement of Nitrogen and Phosphorus Removal in Pilot-Scale Vertical Subsurface Flow-Constructed Wetlands Using Polypropylene Pellets
    Tang, Xianqiang
    Huang, Suiliang
    Ng, Chiu-On
    Li, Jinzhong
    ENVIRONMENTAL ENGINEERING SCIENCE, 2009, 26 (03) : 621 - 631
  • [29] Nitrogen Removal in a Partially Saturated Vertical Subsurface Flow Constructed Wetland Used for Restaurant Wastewater Treatment
    de Carvalho, Orlando, Jr.
    Costa Rodrigues, Marcos Vinicius
    Nonaka, Fernanda Martins
    Machioni, Marcos Antonio, Jr.
    JOURNAL OF ENVIRONMENTAL ENGINEERING, 2018, 144 (07)
  • [30] Enhancing the nitrogen removal of vertical flow constructed wetland by using organic media
    Soundaranayaki, K.
    Gandhimathi, R.