A Bivariate Post-Warranty Maintenance Model for the Product under a 2D Warranty

被引:2
|
作者
Shang, Lijun [1 ]
Shang, Guojun [2 ]
Qiu, Qingan [3 ]
机构
[1] Foshan Univ, Sch Qual Management & Standardizat, Foshan 528000, Peoples R China
[2] North Union Elect Power Ltd Liabil Co, Gao Tou Yao Coal Mine, Ordos 014323, Peoples R China
[3] Beijing Inst Technol, Sch Management & Econ, Beijing 100081, Peoples R China
基金
中国国家自然科学基金;
关键词
2D warranty; customized PM; bivariate post-warranty maintenance; reliability; cost rate model; 2-DIMENSIONAL EXTENDED WARRANTY; SYSTEM SUBJECT; RELIABILITY; POLICIES; STRATEGY; INSPECTION; OPTIMIZATION; DESIGN;
D O I
10.3390/math10121957
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
In this study, by integrating preventive maintenance (PM) into a two-dimensional warranty region, a two-dimensional warranty with customized PM (2D warranty with customized PM) is proposed from the manufacturer's perspective to reduce the warranty cost. The warranty cost of a 2D warranty with customized PM is derived. The manufacturer's tradeoff between PM cost and minimal repair cost saving is obtained by choosing the proper reliability threshold and the number of customized PMs, and the advantage of a 2D warranty with customized PM is illustrated. Second, by integrating PM into the post-warranty period, a bivariate post-warranty maintenance (BPWM) policy is proposed from the consumer's perspective to ensure the reliability of the product through the 2D warranty with customized PM. The expected cost rate model of BPWM is derived. Optimal BPWM is obtained in the numerical experiments. It is shown that a 2D warranty with customized PM is beneficial for both the manufacturer and the consumer, since both the manufacturer's warranty cost and the consumer's total cost are reduced.
引用
收藏
页数:18
相关论文
共 50 条
  • [21] Study of a Random Warranty Model Maintaining Fairness and a Random Replacement Next Model Sustaining Post-Warranty Reliability
    Shang, Lifeng
    Zhang, Nan
    Yang, Li
    Shang, Lijun
    AXIOMS, 2023, 12 (03)
  • [22] A random maintenance last model with preventive maintenance for the product under a random warranty
    Shang, Lijun
    Zou, Anquan
    Qiu, Qingan
    Du, Yongjun
    EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2022, 24 (03): : 544 - 553
  • [23] Optimal post-warranty maintenance policy with repair time threshold for minimal repair
    Park, Minjae
    Jung, Ki Mun
    Park, Dong Ho
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2013, 111 : 147 - 153
  • [24] The Optimal Maintenance Period for Repairable Product after Warranty Expiration under Renewing Warranty
    Hu, Zh. Y.
    Xie, L. Y.
    MATERIALS AND PRODUCT TECHNOLOGIES, 2010, 118-120 : 860 - 865
  • [25] Random replacement policies to sustain the post-warranty reliability
    Shang, Lijun
    Qiu, Qingan
    Wu, Cang
    Du, Yongjun
    JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2023, 29 (02) : 481 - 508
  • [26] Optimal Maintenance Policies During the Post-Warranty Period for Second-Hand Item
    Kim, Dae-Kyung
    Lim, Jae-Hak
    Park, Dong-Ho
    2011 INTERNATIONAL CONFERENCE ON QUALITY, RELIABILITY, RISK, MAINTENANCE, AND SAFETY ENGINEERING (ICQR2MSE), 2011, : 446 - 450
  • [27] Optimal post-warranty replacement policy based on number of product failures for the second-hand product
    Lim, Jae-Hak
    Park, Dong Ho
    Kim, Dae Kyung
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART O-JOURNAL OF RISK AND RELIABILITY, 2024, 238 (05) : 903 - +
  • [28] Determination of optimal post-warranty variable maintenance period for repairable second-hand product based on mean residual life
    Lim, Jae-Hak
    Kim, Dae Kyung
    Park, Dong Ho
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART O-JOURNAL OF RISK AND RELIABILITY, 2022, 236 (06) : 981 - 993
  • [29] Optimal post-warranty replacement policies for batteries with mission durations
    Cai, Jiajia
    Zhao, Xufeng
    ANNALS OF OPERATIONS RESEARCH, 2022,
  • [30] Optimization of post-warranty sequential inspection for second-hand products
    Dae-Kyung Kim
    Jae-Hak Lim
    Dong Ho Park
    JournalofSystemsEngineeringandElectronics, 2017, 28 (04) : 793 - 800