In order to economically recover the copper from the low-grade copper ores, a bioleaching-solvent extraction-electrowinning plant with a design capacity of 2 000 t cathode copper per year in Dexing Copper Mine was operated in September, 1997. The results during the 10-month period of the industrial copper dump leaching have been obtained and the approaches have been carried out Co enhance the copper dissolution from the waste rocks. The overall operation flow; sheet is depicted. The problems confronted in the process and possible way for improving are discussed.
机构:
Kunming Univ Sci & Technol, Fac Met & Energy Engn, Kunming 650093, Peoples R ChinaKunming Univ Sci & Technol, Fac Met & Energy Engn, Kunming 650093, Peoples R China
Liu, Xin-Jie
Liao, Ya-long
论文数: 0引用数: 0
h-index: 0
机构:
Kunming Univ Sci & Technol, Fac Met & Energy Engn, Kunming 650093, Peoples R ChinaKunming Univ Sci & Technol, Fac Met & Energy Engn, Kunming 650093, Peoples R China
Liao, Ya-long
Liu, Qing-feng
论文数: 0引用数: 0
h-index: 0
机构:
Kunming Univ Sci & Technol, Fac Met & Energy Engn, Kunming 650093, Peoples R ChinaKunming Univ Sci & Technol, Fac Met & Energy Engn, Kunming 650093, Peoples R China
Liu, Qing-feng
Wu, Min
论文数: 0引用数: 0
h-index: 0
机构:
Kunming Univ Sci & Technol, Fac Met & Energy Engn, Kunming 650093, Peoples R ChinaKunming Univ Sci & Technol, Fac Met & Energy Engn, Kunming 650093, Peoples R China