共 50 条
- [22] Restart scheduling for genetic algorithms PARALLEL PROBLEM SOLVING FROM NATURE - PPSN V, 1998, 1498 : 357 - 366
- [23] Scheduling trains with Genetic Algorithms PROGRESS IN CONNECTIONIST-BASED INFORMATION SYSTEMS, VOLS 1 AND 2, 1998, : 1017 - 1020
- [25] Optimization of Precast Production Scheduling for Rail Track Slab 2017 IEEE TECHNOLOGY & ENGINEERING MANAGEMENT SOCIETY CONFERENCE (TEMSCON), 2017, : 277 - 282
- [26] A Mathematical Model for Double Layer Precast Production Scheduling 2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 85 - 89
- [27] Constraint programming approach to-precast production scheduling JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2002, 128 (06): : 513 - 521