Calculation of surrounding rock pressure of large section underground excavation metro station based on the construction process

被引:2
|
作者
Zhang, Y. T. [1 ]
Jin, X. G. [2 ]
Dai, Y. J. [1 ]
Li, H. L. [2 ]
Yang, W. G. [1 ]
机构
[1] China Construct Tunnel Construct Co Ltd, Chongqing, Peoples R China
[2] Chongqing Univ, Sch Civil Engn, Chongqing, Peoples R China
关键词
Large Section Tunnel; Construction Process; The pressure of surrounding strata; Numerical Simulation;
D O I
10.1088/1755-1315/626/1/012009
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The traditional calculation method of the surrounding strata pressure of the tunnel does not consider the tunnel construction process. The excavation of the large-section tunnel mostly adopts the section excavation method, which is to excavate and support at the same time. The stress state of the pressure of surrounding strata changes gradually during the excavation process. The traditional calculation results of tunnel surrounding strata pressure are generally large. In this paper, the large-section tunnel is simplified into three parts, and the degree of influence (eta(1), eta(2), eta(3)) of the excavation height h and width b of the advance pilot hole and the distance d between the advance and rear pilot tunnels on the surrounding rock pressure calculation are analyzed. The regression equation for calculating the influencing factors (tunnel depth H, tunnel span B, internal friction angle phi, and rock weight gamma) of surrounding rock pressure (p) is established. Through the numerical analysis, the influence coefficient eta is obtained, the weight coefficient is introduced, and the computing formula of the pressure of surrounding strata of the large-section tunnel excavation is derived. The formula is used to the computing of the pressure of surrounding strata with a large-section subway station and the correct conclusion is obtained.
引用
收藏
页数:9
相关论文
共 50 条
  • [1] Stability analysis of surrounding rock during construction process for large underground caverns at the Jinping II Hydropower station
    Xu, Fu-Gang
    Yang, Xing-Guo
    Zhou, Jia-Wen
    Xing, Hui-Ge
    Huang, Kang-Xin
    Electronic Journal of Geotechnical Engineering, 2014, 19 U : 6331 - 6342
  • [3] Optimization Principle and Application of Excavation Method for Large Section Metro Station
    Wu, Bo
    Huang, Wei
    Wu, Yufang
    INTERNATIONAL JOURNAL OF ENGINEERING RESEARCH IN AFRICA, 2021, 52 : 179 - 190
  • [4] Stability analysis of block in surrounding rock mass of large underground excavation
    College of Environment and Civil Engineering, Chengdu University of Technology, Chengdu 610059, China
    不详
    不详
    Yanshilixue Yu Gongcheng Xuebao, 2006, 2 (306-311):
  • [5] Stability analysis of block in the surrounding rock mass of a large underground excavation
    Liu, J
    Li, ZK
    Zhang, ZY
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2004, 19 (01) : 35 - 44
  • [6] Blasting damage mechanism and excavation stability of surrounding rock of shallow-buried metro station
    Li, Wei
    Zhang, Qingsong
    Bai, Jiwen
    Zhang, Jie
    Yu, Liyuan
    Liu, Jingwei
    Liu, Yankai
    PHYSICS OF FLUIDS, 2024, 36 (05)
  • [7] Three-dimensional numeral analysis on the stability of surrounding rock in large section underground chamber construction
    Xiong Deguo
    Jiang Yongdong
    Zeng Qiang
    Xian Xuefu
    Progress in Mining Science and Safety Technology, Pts A and B, 2007, : 754 - 759
  • [8] Risk Analysis and Control Factors Based on Excavation of a Large Underground Subway Station under Construction
    Zhang, Zhien
    Huang, Mingli
    Wu, Baohua
    SYMMETRY-BASEL, 2020, 12 (10): : 1 - 18
  • [9] Planning and construction of an underground station with a large arch cross section
    Yamagishi, A
    Kashima, T
    Kobayashi, T
    TUNNELS AND METROPOLISES, VOLS 1 AND 2, 1998, : 87 - 91
  • [10] Study on a Surrounding Rock Pressure Calculation Method for Super-Large Section Highway Tunnels
    Gao, Hongjie
    He, Ping
    Chen, Zheng
    Li, Xinyu
    SYMMETRY-BASEL, 2019, 11 (09):