Why Project Size Matters for Contract Choice in Software Development Outsourcing

被引:6
|
作者
Fink, Lior [1 ]
Lichtenstein, Yossi [2 ]
机构
[1] Ben Gurion Univ Negev, Dept Ind Engn & Management, IL-84105 Beer Sheva, Israel
[2] Univ E Anglia, Norwich Business Sch, Norwich NR4 7TJ, Norfolk, England
来源
关键词
Outsourcing; software development; contract choice; project size; mediation; moderation; AGENCY COSTS; PERFORMANCE; CONTINGENCY; STRATEGY; FAMILIARITY; BUSINESS; PORTFOLIOS; PROVISIONS; LEVEL; MODES;
D O I
10.1145/2659254.2659258
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The contractual mechanism of software development outsourcing, typically either fixed-price (FP) or time-and-materials (T&M), determines the nature of incentives, risk sharing, and coordination between client and vendor. While software engineering considers project size as crucial for project planning and success, neither economic nor organizational theory considers size per se among the determinants of contract choice. In this paper, we address the gap between the centrality of project size in the software engineering literature and the attention it receives in software contracting research by modeling and testing the association between project size and contract choice. Existing empirical evidence indicates that FP contracts are appropriate for small development efforts whereas T&M contracts are suitable for larger projects, based on the reasoning that cost and schedule are difficult to estimate in larger projects. This prediction that size is directly associated with contract choice is the basis upon which two models are developed. The first model draws on the contracting efficiency approach to hypothesize that the effect of project size on contract choice is mediated by project detail. The second model draws on the contingency approach to software development risk management to hypothesize that the effect of project size on contract choice is moderated by project detail and vendor familiarity. We test these models using a large portfolio of software development contracts entered into by a leading European bank, and the results confirm that both mediation and moderation are at play.
引用
收藏
页码:54 / 71
页数:18
相关论文
共 50 条
  • [41] The Elements of Choice: Why the Way We Decide Matters
    Ruggeri, Kai
    BEHAVIOURAL PUBLIC POLICY, 2023, 7 (03) : 858 - 863
  • [42] Choice of Software Development Methodologies Do Organizational, Project, and Team Characteristics Matter?
    Vijayasarathy, Leo R.
    Butler, Charles W.
    IEEE SOFTWARE, 2016, 33 (05) : 86 - 94
  • [43] Testing diagnostic tests: Why size matters
    Funk, MJ
    LeGrys, VA
    JOURNAL OF PEDIATRICS, 2005, 146 (02): : 159 - 162
  • [44] WHY PERCEIVED SIZE MATTERS FOR AGENCY TERMINATION
    Corbett, Jack
    Howard, Cosmo
    PUBLIC ADMINISTRATION, 2017, 95 (01) : 196 - 213
  • [45] Pisano on dynamic capability: why size matters
    Winter, Sidney G.
    INDUSTRIAL AND CORPORATE CHANGE, 2018, 27 (06) : 1181 - 1186
  • [46] Why size matters; rugby union and doping
    Cox, Luke Thomas Joseph
    McNamee, Mike
    Petroczi, Andrea
    Bloodworth, Andrew
    PERFORMANCE ENHANCEMENT & HEALTH, 2023, 11 (02)
  • [47] Ultrasmall-in-Nano: Why Size Matters
    Mellor, Ryan D.
    Uchegbu, Ijeoma F.
    NANOMATERIALS, 2022, 12 (14)
  • [48] An Exploratory Study on Strategic Software Development Outsourcing
    Nie, Er
    Hammouda, Imed
    2017 IEEE 12TH INTERNATIONAL CONFERENCE ON GLOBAL SOFTWARE ENGINEERING (ICGSE), 2017, : 106 - 115
  • [49] Global IT outsourcing: Software development across borders
    Van Ryssen, S
    LEONARDO, 2005, 38 (05) : 431 - 431
  • [50] A Readiness Model for Software Development Outsourcing Vendors
    Khan, Siffatullah
    Niazi, Mahmood
    Ahmad, Rashid
    2008 3RD IEEE INTERNATIONAL CONFERENCE GLOBAL SOFTWARE ENGINEERING, PROCEEDINGS, 2008, : 273 - +