Research of Fuzzy Entropy Weight Model on the Risk Evaluating of Wuhan Yangtze River Highway Tunnel

被引:0
|
作者
Wang Yu [1 ]
Liu Hui [1 ]
Yang Zhuan-yun [1 ]
Zhang Jin-mei [1 ]
机构
[1] Chongqing Jiaotong Univ, Sch Appl Technol, Chongqing, Peoples R China
关键词
engineering project; project risk; entropy weight; fuzzy evaluation; index system;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The quantitative description on risk analysis is the assumption of risk management. Traditional risk assessment methods of engineering project are often affected by subjective factors. Fuzzy comprehensive evaluation by entropy weight model serve as a tool provide us a way to assess the risk. This new method could reduce or avoid the effect of subjective factors and fuzzy factors. This article introduce the basic theory of the method and analyze the risk of Wuhan Yangtze River Highway Tunnel,then calculates various risks factor using the entropy power the weight, and combines fuzzy mathematics method to establish evaluation model by combining qualitative analysis and quantificational computability, to evaluate the risk factor and to draw the conclusion. The practical analysis has proven that this method is preferable and feasible.
引用
收藏
页码:125 / 129
页数:5
相关论文
共 50 条
  • [31] Risk assessment model of highway slope based on entropy weight set pair analysis and vehicle laser scanning
    Liu Yang-yang
    Guo Zeng-zhang
    Li Yong-qiang
    Li You-peng
    ROCK AND SOIL MECHANICS, 2018, 39 : 131 - +
  • [32] Occurrence and risk assessment of triclosan in freshwater lakes in the middle Yangtze River basin (Wuhan, Central China)
    Wang, Yuewei
    Cun, Deshou
    Zhang, Zihan
    Pu, Dongwei
    Li, Xiaohui
    Liang, Wei
    Fang, Tao
    WATER BIOLOGY AND SECURITY, 2022, 1 (04):
  • [33] Exploring the green development path of the Yangtze River Economic Belt using the entropy weight method and fuzzy-set qualitative comparative analysis
    Yan, Haijuan
    Hu, Xiaofei
    Wu, Dawei
    Zhang, Jianing
    PLOS ONE, 2021, 16 (12):
  • [34] Risk Assessment Method for Xiangxi Yangtze River Highway Bridge Based on Kent Index Method
    Liang, Guan-ting
    Xiao, Kai-qian
    He, Lin
    Fu, Jun
    Lai, Ze-han
    Zhang, Tao
    2018 3RD INTERNATIONAL CONFERENCE ON COMPUTATIONAL MODELING, SIMULATION AND APPLIED MATHEMATICS (CMSAM 2018), 2018, 310 : 418 - 422
  • [35] Application of the Fuzzy Entropy Weight in Risk Assessment of the Engineering Project
    Wu, Xuyan
    Gu, Huiling
    Hu, Xujie
    Dong, Yuhong
    FIFTH INTERNATIONAL CONFERENCE ON INFORMATION ASSURANCE AND SECURITY, VOL 1, PROCEEDINGS, 2009, : 145 - +
  • [36] RISK ASSESSMENT OF NETWORK AUDIT BASED ON FUZZY ENTROPY WEIGHT
    Xing, Lixian
    Huang, Huilian
    Han, Bin
    3RD INTERNATIONAL SYMPOSIUM ON INFORMATION ENGINEERING AND ELECTRONIC COMMERCE (IEEC 2011), PROCEEDINGS, 2011, : 356 - 359
  • [37] Research on development and utilization of the empty layer space of Nanjing Weisanlu Yangtze River Tunnel
    Su, Li-chang
    Zhu, Xing-ping
    Zu, Xin-yuan
    Hou, Wei-na
    GREEN BUILDING, ENVIRONMENT, ENERGY AND CIVIL ENGINEERING, 2017, : 397 - 401
  • [38] The risk assessment of rockburst intensity in the highway tunnel based on the variable fuzzy sets theory
    Wang, Ai-Feng
    Yang, Xiu-Tao
    Gu, Xin-Bao
    SCIENTIFIC REPORTS, 2023, 13 (01)
  • [39] The risk assessment of rockburst intensity in the highway tunnel based on the variable fuzzy sets theory
    Ai-Feng Wang
    Xiu-Tao Yang
    Xin-Bao Gu
    Scientific Reports, 13
  • [40] Application Study on Fuzzy Influence Diagram in Highway Tunnel Construction Safety Risk Assessment
    Zhou Zhi
    Fang Xue-jin
    2010 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING (ICMSE), 2010, : 272 - 279