Bi-level multi-objective mathematical model for job-shop scheduling: the application of Theory of Constraints

被引:21
|
作者
Kasemset, Chompoonoot [1 ]
Kachitvichyanukul, Voratas [1 ]
机构
[1] Asian Inst Technol, Pathum Thani, Thailand
关键词
Theory of Constraints (TOC); job-shop scheduling; bi-level mathematical model; multi-objective; bottlenecks; MACHINE; TOC; PERFORMANCE;
D O I
10.1080/00207540903176705
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study highlights a different systematic approach to the application of Theory of Constraints (TOC). The work describes the decisions involved in the implementation of TOC in a job-shop environment as a bi-level multi-objective mathematical model. On the first level, the decision is made by minimising idle time on the bottleneck to generate the initial schedule. The second level decision is to improve additional performance measurements by applying the multi-objective technique, while maintaining the bottleneck sequence obtained from the first level decision. Moreover, the concept of transfer lot is also adopted in this model to reduce the waiting time on each machine by allowing overlapped operations. The concept of transfer lot is applied as the constraint on earliest starting time for each job on each machine in the proposed mathematical model. Additionally, the machine set up time and product demands are also adopted to make the model practical to use in the real situation. The numerical examples for both single and multiple bottleneck cases are given to demonstrate how this approach works. The commercially available optimiser, the LINGO 10 software package, is used to solve the examples and the result shows how this approach works in practice.
引用
收藏
页码:6137 / 6154
页数:18
相关论文
共 50 条
  • [31] A multi-objective mathematical model and evolutionary algorithm for the dual-resource flexible job-shop scheduling problem with sequencing flexibility
    Alejandro Vital-Soto
    Mohammed Fazle Baki
    Ahmed Azab
    Flexible Services and Manufacturing Journal, 2023, 35 : 626 - 668
  • [32] An improved multi-objective evolutionary algorithm based on decomposition for bi-objective fuzzy flexible job-shop scheduling problem
    Li R.
    Gong W.-Y.
    Kongzhi Lilun Yu Yingyong/Control Theory and Applications, 2022, 39 (01): : 31 - 40
  • [33] A new multi-objective bi-level programming model for energy and locality aware multi-job scheduling in cloud computing
    Wang, Xiaoli
    Wang, Yuping
    Cui, Yue
    FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF ESCIENCE, 2014, 36 : 91 - 101
  • [34] An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems
    Xia, WJ
    Wu, ZM
    COMPUTERS & INDUSTRIAL ENGINEERING, 2005, 48 (02) : 409 - 425
  • [35] An improved multi-objective genetic algorithm for fuzzy flexible job-shop scheduling problem
    Wang, Xiaojuan
    Li, Wenfeng
    Zhang, Ying
    INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY, 2013, 47 (2-3) : 280 - 288
  • [36] A cloud based improved method for multi-objective flexible job-shop scheduling problem
    Ning, Tao
    Jin, Hua
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2018, 35 (01) : 823 - 829
  • [37] Robust scheduling for multi-objective flexible job-shop problems with random machine breakdowns
    Xiong, Jian
    Xing, Li-ning
    Chen, Ying-wu
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 141 (01) : 112 - 126
  • [38] Study on Multi-objective Flexible Job-shop Scheduling Problem considering Energy Consumption
    Jiang, Zengqiang
    Zuo, Le
    Mingcheng E
    JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT-JIEM, 2014, 7 (03): : 589 - 604
  • [39] An improved particle swarm optimization for multi-objective flexible job-shop scheduling problem
    Jia, Zhaohong
    Chen, Huaping
    Tang, Jun
    PROCEEDINGS OF 2007 IEEE INTERNATIONAL CONFERENCE ON GREY SYSTEMS AND INTELLIGENT SERVICES, VOLS 1 AND 2, 2007, : 1584 - 1589
  • [40] Job-Shop Scheduling with Fuzzy Due Date by Multi-Objective Particle Swarm Optimization
    Abdolrazzagh-Nezhad, Majid
    Sarbishegi, Saeed
    2019 5TH IRANIAN CONFERENCE ON SIGNAL PROCESSING AND INTELLIGENT SYSTEMS (ICSPIS 2019), 2019,