共 50 条
- [23] Research on CRTSIII Ballastless Track Slab Cracks of High-speed Railway COMPUTER-AIDED DESIGN, MANUFACTURING, MODELING AND SIMULATION III, 2014, 443 : 69 - +
- [24] Test Analysis of Vibration Characteristics on CRTS II Slab Ballastless Track Subgrade of the Beijing-Tianjin Intercity High-speed Railway CONSTRUCTION AND URBAN PLANNING, PTS 1-4, 2013, 671-674 : 1263 - +
- [26] Study on Reasonable Length of Ballasted-CRTS II Ballastless Track Transition Section on High-speed Railway Bridge CONSTRUCTION AND URBAN PLANNING, PTS 1-4, 2013, 671-674 : 1301 - +
- [27] The Main Technical Innovation of CRTS III Slab Track for Zhengzhou-Xuzhou High-speed Railway Journal of Railway Engineering Society, 2017, 34 (12): : 18 - 23
- [30] Identification of Mortar Gap Damage of Slab Ballastless Track of High-speed Railway Based on BP Neural Network Tiedao Xuebao/Journal of the China Railway Society, 2022, 44 (07): : 135 - 144