Petri Net-Based Deadlock Avoidance for Single-arm Cluster Tools with Concurrently Processing Two-type Wafers

被引:0
|
作者
Lu, YanJun [1 ]
Pan, ChunRong [1 ]
Qiao, Yan [2 ]
Wu, NaiQi [2 ]
Chen, YuFeng [2 ]
机构
[1] Jiangxi Univ Sci & Technol, Sch Mech & Elect Engn, Ganzhou, Peoples R China
[2] Macau Univ Sci & Technol, Inst Syst Engn, Macau, Peoples R China
基金
中国国家自然科学基金;
关键词
Cluster tools; deadlock avoidance; Petri nets; semiconductor manufacturing; BOUND ALGORITHM; PERFORMANCE; CONSTRAINTS; THROUGHPUT; SYSTEMS; ROBOTS;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
A modern fabrication tends to arrange different wafer types with similar recipes in a lot in order to increase the utilization of cluster tools, meet the demand of customization, and improve the flexibility of the system. Nevertheless, the wafer flow patterns of the different wafer types may be different such that cluster tools are deadlock-prone. This work aims at solving the deadlock problem of single-arm cluster tools with concurrently processing two wafer types. In order to solve it, the deadlock analysis of the system is conducted. Then, a general Petri net (PN) model is developed for the system. Furthermore, a novel method called the PN-based earliest starting strategy is proposed for the system such that the system can operate without deadlock. Moreover, such a method can be used for real-time scheduling. Therefore, it is significant for semiconductor manufacturing.
引用
收藏
页数:6
相关论文
共 29 条
  • [21] Schedulability and scheduling of dual-arm cluster tools with residency time constraints based on Petri net
    Wu, Naiqi
    Zhou, MengChu
    2006 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING, VOLS 1 AND 2, 2006, : 87 - +
  • [22] A Petri-Net-Based Scheduling Strategy for Dual-Arm Cluster Tools With Wafer Revisiting
    Wu, NaiQi
    Zhou, MengChu
    Chu, Feng
    Chu, Chengbin
    IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2013, 43 (05): : 1182 - 1194
  • [23] Petri Net-Based Optimal One-Wafer Cyclic Scheduling of Hybrid Multi-Cluster Tools in Wafer Fabrication
    Yang, FaJun
    Wu, NaiQi
    Qiao, Yan
    Zhou, MengChu
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2014, 27 (02) : 192 - 203
  • [24] Scheduling of Single-Arm Cluster Tools Handling Multiple Wafer Types Based on Double-Layer Configuration of Processing Modules
    Wang, Jufeng
    Leng, Tingting
    Liu, Chunfeng
    Zhou, MengChu
    Zhao, Side
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2024, 21 (04) : 6833 - 6844
  • [25] Wafer Delay Minimization in Scheduling Single-Arm Cluster Tools with Two-Space Process Modules
    Zou, Chengyu
    Zhang, Siwei
    Zeng, Shan
    Gu, Lei
    Li, Jie
    MATHEMATICS, 2024, 12 (12)
  • [26] Scheduling of Time-Constrained Single-Arm Cluster Tools with Two-Space Process Modules in Semiconductor Manufacturing
    Zou, ChengYu
    Wang, GengHong
    Gu, Lei
    Li, Jie
    Wu, NaiQi
    Qiao, Yan
    IEEE ROBOTICS AND AUTOMATION LETTERS, 2024, 9 (07): : 6352 - 6359
  • [27] Petri Net-Based Polynomially Complex Approach to Optimal One-Wafer Cyclic Scheduling of Hybrid Multi-Cluster Tools in Semiconductor Manufacturing
    Yang, FaJun
    Wu, NaiQi
    Qiao, Yan
    Zhou, MengChu
    IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2014, 44 (12): : 1598 - 1610
  • [28] Solving two-sided assembly line balance type-I problem by using of a petri net-based heuristic algorithm
    Peng, Ting-Kuo
    Shiang, Wei-Jung
    Journal of Technology, 2015, 30 (02): : 119 - 134
  • [29] Comment on "Inter net-Based Cognitive Behavioral Therapy With Real-Time Therapist Support via Videoconference for Patients With Obsessive-Compulsive Disorder, Panic Disorder, and Social Anxiety Disorder: Pilot Single-Arm Trial"
    Zargaran, David
    Walsh, Caoimhe
    Koumpa, Foteini Stefania
    Ashraf, Muhammad Arsalan
    White, Amelia Jayne
    Patel, Nikhil
    Tanna, Ravina
    Trepekli, Anna
    Zargaran, Alexander
    JOURNAL OF MEDICAL INTERNET RESEARCH, 2020, 22 (08)