A Sustainable Parallel-machine Scheduling Problem with Time Constraint Based on Hybrid Metaheuristic Algorithm

被引:2
|
作者
Lu, Hong [1 ]
Qiao, Fei [1 ]
机构
[1] Tongji Univ, Sch Elect & Informat Engn, Shanghai, Peoples R China
来源
2020 CHINESE AUTOMATION CONGRESS (CAC 2020) | 2020年
基金
中国国家自然科学基金;
关键词
sustainable scheduling; parallel machine; energy consumption; time constraint; metaheuristic; LOCAL SEARCH; TARDINESS;
D O I
10.1109/CAC51589.2020.9327164
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Sustainable scheduling is of great significance for modern manufacturing companies' long-term development. In this paper, we focus on a sustainable parallel-machine scheduling problem with time constraint, which comes from a rubber manufacturing enterprise. Sustainable demands of this problem include economic benefit (completion time constraint) and environmental effect (energy consumption objective). Besides, this problem not only schedule jobs but also decide the processing speed of machines. We analyze the complexity of the problem and develop a hybrid metaheuristic algorithm to effectively tackle the problem. Experimental results of a case study and comparative analysis show the effectiveness of the proposed algorithm.
引用
收藏
页码:1506 / 1510
页数:5
相关论文
共 50 条
  • [31] A parallel-machine scheduling problem with periodic maintenance under uncertainty
    Jiayu Shen
    Yuanguo Zhu
    Journal of Ambient Intelligence and Humanized Computing, 2019, 10 : 3171 - 3179
  • [32] Minimizing total tardiness in an unrelated parallel-machine scheduling problem
    Shim, S-O
    Kim, Y-D
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2007, 58 (03) : 346 - 354
  • [33] A parallel-machine scheduling problem with periodic maintenance under uncertainty
    Shen, Jiayu
    Zhu, Yuanguo
    JOURNAL OF AMBIENT INTELLIGENCE AND HUMANIZED COMPUTING, 2019, 10 (08) : 3171 - 3179
  • [34] Parallel-Machine Scheduling with Time-Dependent and Machine Availability Constraints
    Miao, Cuixia
    Zou, Juan
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2015, 2015
  • [35] Parallel-machine scheduling with non-simultaneous machine available time
    Shen, Lixin
    Wang, Dan
    Wang, Xiao-Yuan
    APPLIED MATHEMATICAL MODELLING, 2013, 37 (07) : 5227 - 5232
  • [36] A branch-and-bound algorithm for identical parallel-machine total completion time scheduling problem with preemption and release times
    Liaw, Ching-Fang
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2016, 33 (06) : 383 - 390
  • [37] A semi-online algorithm and its competitive analysis for parallel-machine scheduling problem with rejection
    Ma, Ran
    Guo, Sainan
    Miao, Cuixia
    APPLIED MATHEMATICS AND COMPUTATION, 2021, 392
  • [38] A HYBRID METAHEURISTIC FOR SOLVING SINGLE MACHINE SCHEDULING PROBLEM
    Serbencu, Adrian
    Minzu, Viorel
    Cernega, Daniela
    Serbencu, Adriana
    ICINCO 2009: PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON INFORMATICS IN CONTROL, AUTOMATION AND ROBOTICS, VOL 1: INTELLIGENT CONTROL SYSTEMS AND OPTIMIZATION, 2009, : 68 - 74
  • [39] Parallel-machine batching and scheduling to minimize total completion time
    Cheng, TCE
    Chen, ZL
    Kovalyov, MY
    Lin, BMT
    IIE TRANSACTIONS, 1996, 28 (11) : 953 - 956
  • [40] Uniform Parallel-Machine Scheduling with Time Dependent Processing Times
    Zou J.
    Zhang Y.
    Miao C.
    Journal of the Operations Research Society of China, 2013, 1 (02) : 239 - 252