Assessing of project management process knowledge area: procurement based on project management maturity model pmmm) (case study of pqr company)

被引:1
|
作者
Putri, S. M. [1 ]
Pratami, D. [1 ]
Tripiawan, W. [1 ]
Rahmanto, G. [1 ]
机构
[1] Telkom Univ, Sch Ind Engn, Bandung, Indonesia
关键词
PBO (Project Based Organization); Project Management; Project Management Maturity Model (PMMM); Project Procurement management; PERFORMANCE;
D O I
10.1088/1757-899X/505/1/012004
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
PBO (Project Based Organization) is one of the ways for organization in improving their business value and benefits. Organization is challenged to continually improve their project management performance through their capability management process. In other words, applying the measurement of management maturity is needed to gain the determinants of project performance. PQR company is a project-oriented public sector company in its work. Currently it is important for PQR company to know the achievements of its project management. Therefore, the research was conducted to identify the level of maturity of the current project management implementation in the procurement area. This research utilizes a framework by way of Project Management Maturity Model (PMMM). The measurement is conducted to knowledge area Project Procurement Management which the processes are Plan Procurement Management, Conducts Procurements, and Control Procurements. The primary data will be collected by interview the top managers of the company using Self-Assessment Survey. The results show for the overall process Procurement Management rated as level 3 maturity regarding to the standards and process management in organization. By using the PMMM framework enabling organization to enhass the performance of Project Procurement Management through the best practice given.
引用
收藏
页数:8
相关论文
共 50 条
  • [21] Model Research of Software Project Management Based On Knowledge Management
    Cui, Junmei
    Yu, Li
    INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT (EBM2011), VOLS 1-6, 2011, : 1298 - 1302
  • [22] A Model of Project Knowledge Management
    Gasik, Stanislaw
    PROJECT MANAGEMENT JOURNAL, 2011, 42 (03) : 23 - 44
  • [23] RESPONSIBILITY DIVISION MODEL FOR MULTIDISCIPLINARY PROJECT MANAGEMENT - A CASE STUDY OF AN OEM COMPANY
    Ma, Chia-Hsiang
    Chen, Alfred
    Huang, Cheng-Yong
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2006, 23 (06) : 501 - 518
  • [24] Project Management Knowledge Flows in Networks of Project Managers and Project Management Offices: A Case Study in the Pharmaceutical Industry
    Mueller, Ralf
    Glueckler, Johannes
    Aubry, Monique
    Shao, Jingting
    PROJECT MANAGEMENT JOURNAL, 2013, 44 (02) : 4 - 19
  • [25] Case study of project management process improvement
    Kramarenko, S.
    Karaulova, T.
    Annals of DAAAM for 2006 & Proceedings of the 17th International DAAAM Symposium: INTELLIGENT MANUFACTURING & AUTOMATION: FOCUS ON MECHATRONICS AND ROBOTICS, 2006, : 209 - 210
  • [26] Assessment of Portfolio Management Capabilities Based on Organizational Project Management Maturity Model
    Li, Suike
    Bai, Sijun
    Guo, Yuntao
    Feng, Rong
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 2097 - 2101
  • [27] Will knowledge infrastructure capabilities elevate the project management maturity? An empirical study
    Alghail, Adnan
    Yao, Liu
    Abbas, Mohammed
    VINE JOURNAL OF INFORMATION AND KNOWLEDGE MANAGEMENT SYSTEMS, 2024, 54 (04) : 782 - 803
  • [28] Influence of Project Management Maturity on Project Success: Case Study of the Zambian Energy Sector
    Windapo, Abimbola
    Mwanza, Paul
    Filtane, Amanda
    EIGHTEENTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, ICMSEM 2024, 2024, 215 : 1089 - 1099
  • [29] Software project management maturity assessment model to assess software project management practices
    Fauzi, Shukor Sanim Bin Mohd
    Ramli, Nuraminah Bt
    ICCSA 2007: PROCEEDINGS OF THE FIFTH INTERNATIONAL CONFERENCE ON COMPUTATIONAL SCIENCE AND APPLICATIONS, 2007, : 375 - +
  • [30] The Study on Process Model for Project Portfolio Management
    Wen Jian
    DATA PROCESSING AND QUANTITATIVE ECONOMY MODELING, 2010, : 271 - 275