Assessing of project management process knowledge area: procurement based on project management maturity model pmmm) (case study of pqr company)

被引:1
|
作者
Putri, S. M. [1 ]
Pratami, D. [1 ]
Tripiawan, W. [1 ]
Rahmanto, G. [1 ]
机构
[1] Telkom Univ, Sch Ind Engn, Bandung, Indonesia
关键词
PBO (Project Based Organization); Project Management; Project Management Maturity Model (PMMM); Project Procurement management; PERFORMANCE;
D O I
10.1088/1757-899X/505/1/012004
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
PBO (Project Based Organization) is one of the ways for organization in improving their business value and benefits. Organization is challenged to continually improve their project management performance through their capability management process. In other words, applying the measurement of management maturity is needed to gain the determinants of project performance. PQR company is a project-oriented public sector company in its work. Currently it is important for PQR company to know the achievements of its project management. Therefore, the research was conducted to identify the level of maturity of the current project management implementation in the procurement area. This research utilizes a framework by way of Project Management Maturity Model (PMMM). The measurement is conducted to knowledge area Project Procurement Management which the processes are Plan Procurement Management, Conducts Procurements, and Control Procurements. The primary data will be collected by interview the top managers of the company using Self-Assessment Survey. The results show for the overall process Procurement Management rated as level 3 maturity regarding to the standards and process management in organization. By using the PMMM framework enabling organization to enhass the performance of Project Procurement Management through the best practice given.
引用
收藏
页数:8
相关论文
共 50 条
  • [1] Project Management Maturity Model (PMMM) in educational organizations
    Demir, C.
    Kocabas, Ibrahim
    WORLD CONFERENCE ON LEARNING, TEACHING AND ADMINISTRATION PAPERS, 2010, 9
  • [2] The Berkeley Project Management Process Maturity Model: Measuring the value of project management
    Kwak, YH
    Ibbs, CW
    EMS - 2000: PROCEEDINGS OF THE 2000 IEEE ENGINEERING MANAGEMENT SOCIETY, 2000, : 1 - 5
  • [3] A case study: Assessment of R&D project management maturity and improvement in project management process
    Kaya, Y
    Iyigun, I
    TECHNOLOGY MANAGEMENT IN THE KNOWLEDGE ERA, 2001, : 562 - 569
  • [4] Project Management Maturity in an electric power company
    da Silva Nunes, Diego Augusto
    Porto Bellini, Carlo Gabriel
    CONTABILIDADE GESTAO E GOVERNANCA, 2011, 14 (01): : 94 - 106
  • [5] Assessing Adoption of Project Management Knowledge Areas and Maturity Level: Case Study of a Public Agency in Malaysia
    Abdul Rasid, Siti Zaleha
    Wan Ismail, Wan Khairuzzaman
    Mohammad, Nor Hazlin
    Long, Choi Sang
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2014, 30 (02) : 264 - 271
  • [6] The project management maturity model
    Crawford, J. Kent
    INFORMATION SYSTEMS MANAGEMENT, 2006, 23 (04) : 50 - 58
  • [7] Study of construction project management maturity model
    Liqun, Liu
    Yuhua, An
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2007, : 355 - 360
  • [8] Project management process maturity (PM)2 model
    Kwak, YH
    Ibbs, CW
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2002, 18 (03) : 150 - 155
  • [9] Assessment of knowledge process capabilities toward project management maturity: an empirical study
    Alghail, Adnan
    Yao, Liu
    Abbas, Mohammed
    Baashar, Yahia
    JOURNAL OF KNOWLEDGE MANAGEMENT, 2022, 26 (05) : 1207 - 1234
  • [10] Integration of Project Management with NPD Process A Metalworking Company Case Study
    Costa, Irene
    Fernandes, Gabriela
    Tereso, Anabela
    2017 INTERNATIONAL CONFERENCE ON ENGINEERING, TECHNOLOGY AND INNOVATION (ICE/ITMC), 2017, : 1191 - 1200