Using Probabilistic Fault Tree Analysis and Monte Carlo Simulation to Examine the Likelihood of Risks Associated with Ballasted Railway Drainage Failure

被引:9
|
作者
Usman, Kristianto [1 ,2 ]
Peter Nicholas Burrow, Michael [2 ]
Singh Ghataora, Gurmel [2 ]
Sasidharan, Manu [2 ]
机构
[1] Univ Lampung, Engn Fac, Dept Civil Engn, Bandar Lampung, Indonesia
[2] Univ Birmingham, Sch Engn, Dept Civil Engn, Birmingham, England
关键词
MANAGEMENT; DETERIORATION;
D O I
10.1177/0361198120982310
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Inadequate track drainage can lead to a variety of issues, including flooding, accelerated track degradation, and progressive or sudden failure of railway track, slope, or embankment. These can result in unplanned track maintenance, additional passenger travel costs, and damage to third party property. However, railway drainage asset management is challenging because it involves the consideration of large interconnected assets, limited maintenance budgets, and unknown failure probabilities. To address this issue, this paper introduces a risk-informed approach for railway drainage asset management that uses fault tree analysis to identify the factors that contribute to railway drainage flood risk and quantifies the likelihood of the occurrence of these factors using Monte Carlo simulation. This rational approach enables drainage asset managers to evaluate easily the factors that affect the likelihood of railway track drainage failure, thereby facilitating the prioritization of appropriate mitigation measures and in so doing improve the allocation of scarce maintenance resources. The analysis identified 46 basic and 49 intermediate contributing factors associated with drainage failure of ballasted railway track (undesired event). The usefulness of the approach is demonstrated for three sites on the UK railway network, namely, Ardsley Tunnel, Clay Cross Tunnel, and Draycott. The analysis shows that the Clay Cross Tunnel had the highest probability of drainage failure and should be prioritized for maintenance over the other two sites. The maintenance required should focus on blockages because of vegetation overgrowth or debris accumulation.
引用
收藏
页码:70 / 89
页数:20
相关论文
共 50 条
  • [41] Delineation of Seismic Sources in Probabilistic Seismic-Hazard Analysis Using Fuzzy Cluster Analysis and Monte Carlo Simulation
    Ansari, A.
    Firuzi, E.
    Etemadsaeed, L.
    BULLETIN OF THE SEISMOLOGICAL SOCIETY OF AMERICA, 2015, 105 (04) : 2174 - 2191
  • [42] Spatial analysis and probabilistic risk assessment of exposure to fluoride in drinking water using GIS and Monte Carlo simulation
    Ali, Shahjad
    Ali, Hamid
    Pakdel, Manizhe
    Askari, Sahar Ghale
    Mohammadi, Ali Akbar
    Rezania, Shahabaldin
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2022, 29 (04) : 5881 - 5890
  • [43] Spatial analysis and probabilistic risk assessment of exposure to fluoride in drinking water using GIS and Monte Carlo simulation
    Shahjad Ali
    Hamid Ali
    Manizhe Pakdel
    Sahar Ghale Askari
    Ali Akbar Mohammadi
    Shahabaldin Rezania
    Environmental Science and Pollution Research, 2022, 29 : 5881 - 5890
  • [44] Probabilistic analysis of ice and sloping structure interaction based on ISO standard by using Monte-Carlo simulation
    Sinsabvarodom, Chana
    Chai, Wei
    Leira, Bernt J.
    Hoyland, Knut V.
    Naess, Arvid
    MARINE DESIGN XIII, VOLS 1 & 2, 2018, : 789 - 799
  • [45] Probabilistic Analysis for Estimating the Hydrogen Desorption Time from Steel Wire Rods Using Monte Carlo Simulation
    Ourrad, Soumia
    Houmadi, Youcef
    Ziadi, Abdel Kader
    Mamoune, Sidi Mohammed Aissa
    Lousdad, Abdelkader
    ANNALES DE CHIMIE-SCIENCE DES MATERIAUX, 2019, 43 (04): : 241 - 248
  • [46] Estimating human health risks associated with heavy metal exposure from bottled water using Monte Carlo simulation
    Mirzaei, Nezam
    Kalteh, Safa
    Zamani-Badi, Hakime
    Moradpour, Heshmatallah
    Parmoozeh, Zeinab
    Baziar, Mansour
    HELIYON, 2023, 9 (10)
  • [47] Extending Performance and Evaluating Risks of PV Systems Failure Using a Fault Tree and Event Tree Approach: Analysis of the Possible Application
    Colli, Alessandra
    2012 38TH IEEE PHOTOVOLTAIC SPECIALISTS CONFERENCE (PVSC), 2012, : 2922 - 2926
  • [48] Monte Carlo probabilistic sensitivity analysis for patient level simulation models: Efficient estimation of mean and variance using ANOVA
    O'Hagan, Anthony
    Stevenson, Matt
    Madan, Jason
    HEALTH ECONOMICS, 2007, 16 (10) : 1009 - 1023
  • [49] Probabilistic analysis of historic masonry bridges to random ground motion by Monte Carlo Simulation using Response Surface Method
    Haciefendioglu, Kemal
    Basaga, Hasan Basri
    Banerjee, Swagata
    CONSTRUCTION AND BUILDING MATERIALS, 2017, 134 : 199 - 209
  • [50] Lifecycle Based User Value Analysis of Rail - Road Level Crossings: Probabilistic Approach Using Monte Carlo Simulation
    Grossberger, Hirut
    Mauler, Christoph
    Michelberger, Frank
    PROCEEDINGS OF THE 16TH INTERNATIONAL SCIENTIFIC CONFERENCE RELIABILITY AND STATISTICS IN TRANSPORTATION AND COMMUNICATION (RELSTAT-2016), 2017, 178 : 409 - 418