Performance and Reliability Improvement of the Call Detail Record Processing System: A Case Study from a Telecommunication Enterprise

被引:0
|
作者
Siangzhee, Nipakorn [1 ]
Achalakul, Tiranee [1 ]
机构
[1] King Mongkuts Univ Technol Thonburi, Dept Comp Engn, Bangkok, Thailand
关键词
Batch System; Job Scheduler; Rate-Monotonic Scheduling Algorithm;
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Several data processing systems in a telecommunication enterprise rely on batch scheduling. The batch systems usually contain a large amount of data and require complex scheduling process. Using native job launchers like Cron cannot handle these requirements and will likely degrade performance and reliability of the system. In this paper we propose to custom-design a specific job scheduler with dynamic priority assignment for the Call Detail Record (CDR) processing system at a telecommunication enterprise. Our scheduler is designed based on the Sourceforge's Open Source Job Scheduler (JS) software with the rate-monotonic (RM) scheduling algorithm. The algorithm is used for on-time job completion purpose. We then evaluate the results in both the perspective of performance and reliability improvement. We also compare the results with the native job launchers. The performance metrics used are the speed of data processing and the number of over-period job. The reliability metric used is the completeness of data in the system.
引用
收藏
页码:1536 / 1540
页数:5
相关论文
共 50 条
  • [41] Bridge System Performance Assessment from Structural Health Monitoring: A Case Study
    Liu, Ming
    Frangopol, Dan M.
    Kim, Sunyong
    JOURNAL OF STRUCTURAL ENGINEERING, 2009, 135 (06) : 733 - 742
  • [42] Performance assessment and improvement of an existing air conditioning system of a supermarket: A case study on Bi-Lo supermarket
    Hansen, M.
    Rasul, M. G.
    PROCEEDINGS OF THE 3RD IASME/WSEAS INTERNATIONAL CONFERENCE ON ENERGY & ENVIRONMENT: ENERGY AND ENVIRONMENT III, 2008, : 55 - +
  • [43] Exergy analysis and performance improvement of liquid-desiccant deep-dehumidification system: An engineering case study
    Guan, Bowen
    Zhang, Tao
    Jun, Liu
    Liu, Xiaohua
    ENERGY, 2020, 196 (196)
  • [44] Performance Improvement of Oil and Gas Industry via Lean Concept: A Case Study from Valves Requisition
    Ratnayake, R. M. Chandima
    Chaudry, M. O.
    2015 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2015, : 1472 - 1479
  • [45] Accumulation of technological capabilities and operational performance improvement: evidence from a firm-level case study
    Fonseca, Marcelio
    Figueiredo, Paulo Negreiros
    REVISTA BRASILEIRA DE INOVACAO, 2014, 13 (02): : 311 - 343
  • [46] Reliability assessment of the generation resource plan from a societal perspective: A case study of an Indian power system
    Sarkar, A
    ENERGY AND ECONOMIC GROWTH: IS SUSTAINABLE GROWTH POSSIBLE?, VOLS 1-3, 1997, : 479 - 489
  • [47] Comparative study on the improvement of a distributed energy system performance by optimized operation strategy from design to operation
    Jin, Baohong
    Song, Jiajia
    Liao, Yichuan
    ENERGY REPORTS, 2023, 10 : 1726 - 1738
  • [48] The Optimized Design for the Employee Performance Appraisal System of Large State-Owned Tourism Enterprise: A Case Study for DJL Travel Group
    Cao Ningxin
    Wu Jiong
    STRATEGY IN EMERGING MARKETS: MANAGEMENT, FINANCE AND SUSTAINABLE DEVELOPMENT, 2014, : 695 - 700
  • [49] A photovoltaic net metering system and its environmental performance: A case study from Slovenia
    Virtic, Peter
    Lukman, Rebeka Kovacic
    JOURNAL OF CLEANER PRODUCTION, 2019, 212 : 334 - 342
  • [50] A case study in performance appraisal system development: Lessons from a municipal police department
    Roberts, GE
    AMERICAN REVIEW OF PUBLIC ADMINISTRATION, 1996, 26 (03): : 361 - 385