- [21] Mixed integer programming model for short term planning in open-pit mines TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2013, 122 (02): : 101 - 109
- [22] Production schedule optimisation in underground hard rock mining using mixed integer programming PROJECT EVALUATION CONFERENCE 2007, 2007, 2007 (04): : 169 - +
- [24] EXPERIENCE IN ORE RESERVES EXTRACTION IN OPEN-PIT BORDERS AND BOTTOM IN TRANSITION FROM OPEN-PIT TO UNDERGROUND MINING JOURNAL OF MINING INSTITUTE, 2012, 198 : 37 - 42
- [27] Using chance constrained binary integer programming in optimising long term production scheduling for open pit mine design TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2007, 116 (02): : 58 - 66