A mixed integer linear programming framework for optimising the extraction strategy of open pit - underground mining options and transitions

被引:14
|
作者
Afum, Bright Oppong [1 ]
Ben-Awuah, Eugene [1 ]
Askari-Nasab, Hooman [2 ]
机构
[1] Laurentian Univ, Bharti Sch Engn, MOL, Sudbury, ON, Canada
[2] Univ Alberta, Sch Min & Petr Engn, Dept Civil & Environm Engn, MOL, Edmonton, AB, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
Mixed integer linear programming; open pit and underground mine planning; mining options; mine optimisation; transition depth; crown pillar; OPTIMIZATION; SURFACE; DEPTH;
D O I
10.1080/17480930.2019.1701968
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The decision to exploit a mineral deposit that can be extracted by open pit and/or underground mining involves consideration of the following options: (a) independent open pit extraction; (b) independent underground extraction; (c) simultaneous open pit and underground (OPUG) extraction; (d) sequential OPUG extraction; and (e) combinations of (c) and (d). This paper investigates the extraction strategy for deposits using Mixed Integer Linear Programming (MILP) optimisation framework to maximise the net present value and determine the schedules for mining, processing, underground capital and operational developments, and 3D crown pillar position. The MILP framework is implemented for a gold deposit. The results showed a combined sequential and simultaneous open pit and underground (OPUG) mining with crown pillar as the optimal extraction option generating NPV that is 11% and 13% better than independent OP or UG mining, respectively.
引用
收藏
页码:700 / 724
页数:25
相关论文
共 50 条
  • [1] Mixed integer linear programming formulations for open pit production scheduling
    Askari-Nasab H.
    Pourrahimian Y.
    Ben-Awuah E.
    Kalantari S.
    Journal of Mining Science, 2011, 47 (3) : 338 - 359
  • [2] MIXED INTEGER LINEAR PROGRAMMING FORMULATIONS FOR OPEN PIT PRODUCTION SCHEDULING
    Askari-Nasab, H.
    Pourrahimian, Y.
    Ben-Awuah, E.
    Kalantari, S.
    JOURNAL OF MINING SCIENCE, 2011, 47 (03) : 338 - 359
  • [3] Mixed Integer Linear Programming Model for Open Pit Mine Scheduling
    Aallaoui, S.
    Azzamouri, A.
    Tchernev, N.
    IFAC PAPERSONLINE, 2022, 55 (10): : 2276 - 2281
  • [4] A robust mixed integer linear programming framework for underground cut-and-fill mining production scheduling
    Huang, Shuwei
    Li, Guoqing
    Ben-Awuah, Eugene
    Afum, Bright Oppong
    Hu, Nailian
    INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2020, 34 (06) : 397 - 414
  • [5] Strategic mining options optimization:Open pit mining, underground mining or both
    Ben-Awuah Eugene
    Richter Otto
    Elkington Tarrant
    Pourrahimian Yashar
    InternationalJournalofMiningScienceandTechnology, 2016, 26 (06) : 1065 - 1071
  • [6] Strategic mining options optimization: Open pit mining, underground mining or both
    Eugene, Ben-Awuah
    Otto, Richter
    Tarrant, Elkington
    Yashar, Pourrahimian
    INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2016, 26 (06) : 1065 - 1071
  • [7] A Set of Classified Integer Programming (IP) Models for Optimum Transition from Open Pit to Underground Mining Methods
    A. Soltani Khaboushan
    M. Osanloo
    Natural Resources Research, 2020, 29 : 1543 - 1559
  • [8] A Set of Classified Integer Programming (IP) Models for Optimum Transition from Open Pit to Underground Mining Methods
    Khaboushan, A. Soltani
    Osanloo, M.
    NATURAL RESOURCES RESEARCH, 2020, 29 (03) : 1543 - 1559
  • [9] A Stochastic Mixed Integer Programming Framework for Underground Mining Production Scheduling Optimization Considering Grade Uncertainty
    Huang, Shuwei
    Li, Guoqing
    Ben-Awuah, Eugene
    Afum, Bright Oppong
    Hu, Nailian
    IEEE ACCESS, 2020, 8 : 24495 - 24505
  • [10] A mixed integer linear programming model for short-term open pit mine production scheduling
    Eivazy, H.
    Askari-Nasab, H.
    TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2012, 121 (02): : 97 - 108