THE IMPACT OF MODERNIZATION ON THE PRODUCTIVITY OF A MULTI-STAGE PRODUCTION OF TRANSFORMER SHEETS

被引:0
|
作者
Michlowicz, Edward [1 ]
Smolinska, Katarzyna [1 ]
机构
[1] AGH Univ Sci & Technol, PL-30059 Krakow, Poland
关键词
Productivity; equipment modernization; efficiency indicator OEE;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Production is concerned with short throughput times and high schedule reliability in order to on the one hand, fulfill customer demands and on the other hand, increase planning reliability. However, from the business perspective, it is preferred that the available production equipment is highly utilized and that there is the lowest possible WIP (Work in Process) level. For the evaluation system used in the study TPM method. The TPM method most commonly employs three indicators: MTTR, MTBF and most typically - OEE. The first two are associated exclusively with technical issues of the examined production line. The object of the study was the production plant of transformer sheets. The article presents parts of research OEE performance indicator for many production lines. In particular was examined the impact of modernization of the line on the efficiency.
引用
收藏
页码:1720 / 1726
页数:7
相关论文
共 50 条
  • [41] Multi-stage classification
    Senator, TE
    FIFTH IEEE INTERNATIONAL CONFERENCE ON DATA MINING, PROCEEDINGS, 2005, : 386 - 393
  • [42] Multi-stage programming
    Taha, W
    Sheard, T
    ACM SIGPLAN NOTICES, 1997, 32 (08) : 321 - 321
  • [43] Evaluation progress and regress of balanced scorecards by multi-stage Malmquist Productivity Index
    Lotfi, Farhad Hosseinzadeh
    Jahanshahloo, Gholam Reza
    Vaez-Ghasemi, Mohsen
    Moghaddas, Zohreh
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2013, 30 (05) : 345 - 354
  • [44] Modelling and analysis of dynamic capacity complexity in multi-stage production
    Deif, Ahmed M.
    ElMaraghy, Hoda A.
    PRODUCTION PLANNING & CONTROL, 2009, 20 (08) : 737 - 749
  • [45] DECENTRALIZED OPTIMAL CONTROL OF MULTI-STAGE PRODUCTION PROCESSES.
    Gruver, W.A.
    Narasimhan, S.L.
    International Journal on Policy and Information, 1980, 4 (01): : 33 - 41
  • [46] Integrated optimization of production planning and scheduling for multi-stage workshop
    Zhang, Xiaodong
    Yan, Hongsen
    Jixie Gongcheng Xuebao/Chinese Journal of Mechanical Engineering, 2005, 41 (09): : 98 - 105
  • [47] Study on the productivity of the multi-stage fractured horizontal wells in tight oil reservoirs
    Xu, Linjing
    Zhang, Shicheng
    Wang, Fei
    Ma, Xinfang
    INTERNATIONAL JOURNAL OF OIL GAS AND COAL TECHNOLOGY, 2019, 20 (03) : 243 - 265
  • [48] Multi-stage, pull-type production/inventory systems
    Altiok, Tayfur
    Ranjan, Raghav
    IIE Transactions (Institute of Industrial Engineers), 1995, 27 (02): : 190 - 200
  • [49] Optimization of multi-stage production planning in ERW pipe manufacturing
    Mechanical Engineering School, University of Science and Technology Beijing, Beijing 100083, China
    Beijing Keji Daxue Xuebao, 2006, 7 (691-695):
  • [50] Study on the production of cements using a multi-stage grinding strategy
    Knappert, Jonas
    Fleiger, Philipp M.
    Seemann, Stefan
    ZKG INTERNATIONAL, 2023, 76 (07): : 38 - 44