An Amplified COCOMO-II Based Cost Estimation Model in Global Software Development Context

被引:14
|
作者
Khan, Junaid Ali [1 ]
Khan, Saif Ur Rehman [1 ]
Khan, Tamim Ahmed [2 ]
Khan, Inayat Ur Rehman [1 ]
机构
[1] COMSATS Univ Islamabad CUI, Dept Comp Sci, Islamabad 45550, Pakistan
[2] Bahria Univ, Dept Software Engn, Islamabad 44000, Pakistan
关键词
Estimation; Mathematical model; Software; Computational modeling; Context modeling; Companies; Outsourcing; Global software development; cost estimation; COCOMO-II; cost overhead;
D O I
10.1109/ACCESS.2021.3089870
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Global Software Development (GSD) projects comprise several critical cost drivers that affect the overall project cost and budget overhead. Thus, there is a need to amplify the existing model in GSD context to reduce the risks associated with cost overhead. Motivated by this, the current work aims at amplifying the existing algorithmic model with GSD cost drivers to get efficient estimates in the context of GSD. To achieve the targeted research objective, current state-of-the-art cost estimation techniques and GSD models are reported. Furthermore, the current study has proposed a conceptual framework to amplify the algorithmic COCOMO-II model in the GSD domain to accommodate additional cost drivers empirically validated by a systematic review and industrial practitioners. The main phases of amplification include identifying cost drivers, categorizing cost drivers, forming metrics, assignment of values, and finally altering the base model equation. Moreover, the proposed conceptual model's effectiveness is validated through expert judgment, case studies, and Magnitude of Relative Estimates (MRE). The obtained estimates are efficient, quantified, and cover additional GSD aspects than the existing models; hence we could overcome the GSD project's overall risk by implementing the model. Finally, the results indicate that the model needs further calibration and validation.
引用
收藏
页码:88602 / 88620
页数:19
相关论文
共 50 条
  • [21] Impact of CMMI Based Software Process Maturity on COCOMO II's Effort Estimation
    Al Yahya, Majed
    Ahmad, Rodina
    Lee, Sai
    INTERNATIONAL ARAB JOURNAL OF INFORMATION TECHNOLOGY, 2010, 7 (02) : 129 - 137
  • [22] Fuzzy Emotional COCOMO II Software Cost Estimation (FECSCE) using Multi-Agent Systems
    Kazemifard, M.
    Zaeri, A.
    Ghasem-Aghaee, N.
    Nematbakhsh, M. A.
    Mardukhi, F.
    APPLIED SOFT COMPUTING, 2011, 11 (02) : 2260 - 2270
  • [23] Effort Estimation in Agile Global Software Development Context
    Britto, Ricardo
    Usman, Muhammad
    Mendes, Emilia
    AGILE METHODS: LARGE-SCALE DEVELOPMENT, REFACTORING, TESTING, AND ESTIMATION, 2014, 199 : 182 - 192
  • [24] Effort estimation in agile global software development context
    Britto, Ricardo, 1600, Springer Verlag (199):
  • [25] Towards an adaptation of the COCOMO cost model to the software measurement theory
    Idri, A
    Griech, B
    El Iraki, A
    SOFTWARE ENGINEERING - ESEC/FSE '97, 1997, 1301 : 525 - 526
  • [26] Software quality analysis based on cost and error using fuzzy combined COCOMO model
    Manikavelan, D.
    Ponnusamy, R.
    JOURNAL OF AMBIENT INTELLIGENCE AND HUMANIZED COMPUTING, 2020,
  • [27] A model for software development effort and cost estimation
    Pillai, K
    Nair, VSS
    IEEE TRANSACTIONS ON SOFTWARE ENGINEERING, 1997, 23 (08) : 485 - 497
  • [28] PCA based cost estimation model for agile software development projects
    Garg, Sakshi
    Gupta, Daya
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND OPERATIONS MANAGEMENT (IEOM), 2015,
  • [29] E-cost estimation using expert judgment and COCOMO II
    Department of Computer Science, Faculty of Industrial Information Technology, Universiti Industri Selangor, Selangor, Malaysia
    不详
    不详
    不详
    Proc. Int. Symp. Inf. Technol. - Syst. Dev. Appl. Knowl. Soc., ITSim, 1600, (1262-1267):
  • [30] Achievements and challenges in Cocomo-based software resource estimation
    Boehm, Barry W.
    Valerdi, Ricardo
    IEEE SOFTWARE, 2008, 25 (05) : 74 - 83