Minimizing total flow time in single machine environment with release time: An experimental analysis

被引:6
|
作者
Guo, Y
Lim, A [1 ]
Rodrigues, B
Yu, S
机构
[1] Hong Kong Univ Sci & Technol, Dept Ind Engn & Engn Management, Hong Kong, Hong Kong, Peoples R China
[2] Natl Univ Singapore, Sch Comp, Singapore 117543, Singapore
[3] Singapore Management Univ, Sch Business, Singapore 259756, Singapore
关键词
machine scheduling; flow time; experimental analysis; performance prediction;
D O I
10.1016/j.cie.2004.06.004
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
We study the problem of minimizing total flow time on a single machine with job release times. This problem is NP-complete for which is no constant ratio approximation algorithm. Our objective is to study experimentally how well, on average, the problem can be solved. The algorithm we use produces non-preemptive schedules converted from preemptive ones. We evaluate average solution quality for the problem to identify the characteristics of difficult instances. Results obtained are compared with those recently obtained by other researchers. Based on extensive experiments, we also develop an empirical model to predict solution quality using interpolation. (C) 2004 Elsevier Ltd. All rights reserved.
引用
收藏
页码:123 / 140
页数:18
相关论文
共 50 条
  • [41] Minimizing total tardiness on a single machine with unequal release dates
    Su, Ling-Huey
    Chen, Chung-Jung
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 186 (02) : 496 - 503
  • [42] Robust scheduling on a single machine to minimize total flow time
    Lu, Chung-Cheng
    Lin, Shih-Wei
    Ying, Kuo-Ching
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (07) : 1682 - 1691
  • [43] MINIMIZING FLOW TIME ON A SINGLE-MACHINE WITH JOB CLASSES AND SETUP TIMES
    MASON, AJ
    ANDERSON, EJ
    NAVAL RESEARCH LOGISTICS, 1991, 38 (03) : 333 - 350
  • [44] On minimizing total completion time in batch machine scheduling
    Poon, CK
    Cu, WC
    INTERNATIONAL JOURNAL OF FOUNDATIONS OF COMPUTER SCIENCE, 2004, 15 (04) : 593 - 607
  • [45] Minimizing total completion time in two-machine flow shops with exact delays
    Huo, Yumei
    Li, Haibing
    Zhao, Hairong
    COMBINATORIAL OPTIMIZATION AND APPLICATIONS, PROCEEDINGS, 2008, 5165 : 427 - +
  • [46] Lower bounds for minimizing total completion time in a two-machine flow shop
    Han Hoogeveen
    Linda van Norden
    Steef van de Velde
    Journal of Scheduling, 2006, 9 : 559 - 568
  • [47] Minimizing total flow time in a two-machine flowshop problem with minimum makespan
    Gupta, JND
    Neppalli, VR
    Werner, F
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2001, 69 (03) : 323 - 338
  • [48] Minimizing total completion time in two-machine flow shops with exact delays
    Huo, Yumei
    Li, Holibing
    Zhao, Hairong
    COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (06) : 2018 - 2030
  • [49] Minimizing total completion time in a two-machine flow shop with deteriorating jobs
    Wang, Ji-Bo
    Ng, C. T. Daniel
    Cheng, T. C. E.
    Liu, Li-Li
    APPLIED MATHEMATICS AND COMPUTATION, 2006, 180 (01) : 185 - 193
  • [50] Lower bounds for minimizing total completion time in a two-machine flow shop
    Hoogeveen, Han
    van Norden, Linda
    van de Velde, Steef
    JOURNAL OF SCHEDULING, 2006, 9 (06) : 559 - 568