Regulatory framework for mine project permitting

被引:0
|
作者
Chamberlain, C
Johnston, G
Joyce, C
机构
关键词
D O I
暂无
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
The permitting of new mining projects has evolved into a highly complex process that must be carefully managed. Only by developing a thorough understanding of the issues involved and stakeholder interrelationships can successful strategies be developed that integrate the often competing demands of: regulatory requirements, commercial requirements, social/cultural needs, and technical issues, Properly implemented, this approach can result in: shortened approval timeframes, better project definition broad based community support, and favorably disposed government departments, Mining companies that adopt a strategic and formailsed approach to management of permitting risked will ensure that liabilities are contained, In this regard, it is clear that a strong environmental record will be a critical competitive advantage in pursuing mining exploration and development opportunities into the future, It is already a prerequisite for establishing businesses in a number of countries.
引用
收藏
页码:193 / 197
页数:5
相关论文
共 50 条
  • [1] Regulatory permitting: Exploration to mine development
    Downing, Bruce
    Canadian Mining Journal, 2024, 145 (07)
  • [2] PERMITTING AND REGULATORY FLEXIBILITY IN COMPOSTING
    MOEGER, CB
    BIOCYCLE, 1994, 35 (01) : 72 - 74
  • [3] Engineering and permitting of the La Trinidad project
    Harrison, JC
    PRACTICAL ASPECTS OF INTERNATIONAL MANAGEMENT AND PROCESSING, 1996, : 21 - 26
  • [4] Environmental permitting for the Canal Electric Project
    Crouch, GF
    PIPELINE CROSSINGS 1996: PROCEEDINGS OF THE SPECIALTY CONFERENCE, 1996, : 237 - 244
  • [5] PERMITTING A LARGE COGENERATION PROJECT IN CALIFORNIA
    VARDEMAN, RD
    IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 1988, 24 (06) : 1160 - 1167
  • [6] Permitting a new mine: Insights from the community debate
    Campbell, Gary
    Roberts, Mark
    RESOURCES POLICY, 2010, 35 (03) : 210 - 217
  • [7] Framework for Impact Assessment of Regulatory Science: Application to the PROTECT Project
    Kurz, Xavier
    Arlett, Peter
    Slattery, Jim
    Blake, Kevin
    de Vries, Corinne
    PHARMACOEPIDEMIOLOGY AND DRUG SAFETY, 2015, 24 : 443 - 443
  • [8] Financial provisioning for mine closure: Developing a policy and regulatory framework in the transition economies
    Nazari, Mehrdad M.
    Industry and Environment, 2000, 23 (SPEC. ISS.): : 54 - 56
  • [9] Regulatory framework on the UAM operational concepts of the ASSURED-UAM project
    Mazur, Anna Maria
    ten Thije, Jens
    Vreeken, Joost
    Hesselink, Henk
    Dziugiel, Bartosz
    Wyka, Sylwester
    Liberacki, Adam
    Idzikowska, Teresa
    Stanczyk, Anna Dorota
    Utracka, Agata
    Ginter, Piotr
    Czupryn, Sandra
    Giannuzzi, Michele
    Melo, Sandra
    Witkowska-Konieczny, Adriana
    Di Vito, Vittorio
    Menichino, Aniello
    AIRCRAFT ENGINEERING AND AEROSPACE TECHNOLOGY, 2022, 94 (09): : 1491 - 1498
  • [10] Permitting, construction and commissioning of the Gosowong Gold Mine, Halmahera, Indonesia
    Carmichael, TJ
    Corp, DJ
    PACRIM'99: INTERNATIONAL CONGRESS ON EARTH SCIENCE, EXPLORATION AND MINING AROUND THE PACIFIC RIM, PROCEEDINGS, 1999, 99 (04): : 607 - 616