Bi-objective optimization of maintenance scheduling for power systems

被引:10
|
作者
Hadjaissa, B. [1 ]
Ameur, K. [1 ]
Cheikh, S. M. Ait [2 ]
Essounbouli, N. [3 ]
机构
[1] Amar Telidji Univ, LACoSERE Lab, BP 37G,Ghardaia Rd, Laghouat 03000, Algeria
[2] Ecole Natl Polytech, LDCCP Lab, 10 Ave H Badi BP 182, Harrach Algiers, Algeria
[3] Univ Reims, CReSTIC Lab, F-10026 Troyes, France
关键词
MGA; HRPS PV/FC; Maintenance scheduling; Mono-objective optimization; Bi-objective optimization; RENEWABLE ENERGY-SYSTEMS; GENETIC ALGORITHM;
D O I
10.1007/s00170-015-8053-7
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Enhance the quality of energy production in power generating stations and reducing its cost have become of paramount importance. One of the methods to reach that goal is by minimizing the maintenance scheduling time. For this purpose, a new competitive mechanism, based on a modified genetic algorithm (MGA), has been proposed to perform the preventive maintenance (PM) scheduling. Firstly, a mono-objective optimization (makespan) has implemented, and the results were quite good. Secondly, and in order to benefit from the waste time, a bi-objective optimization was developed to find a trade-off between makespan and training time of operators. Finally, the MGA-based maintenance scheduling was tested on a hybrid renewable power system (HRPS), that uses photovoltaic modules and a fuel cell (PV/FC) as sources and the telecommunication platform as load, the obtained results have proved the high efficiency of the proposed MGA-based maintenance scheduling.
引用
收藏
页码:1361 / 1372
页数:12
相关论文
共 50 条
  • [41] A Bi-Objective Paediatric Operating Theater Scheduling
    Dekhici, Latifa
    Belkadi, Khaled
    INTERNATIONAL JOURNAL OF HEALTHCARE INFORMATION SYSTEMS AND INFORMATICS, 2023, 18 (01)
  • [42] A bi-objective evolutionary approach to robust scheduling
    Surico, Michele
    Kaymak, Uzay
    Naso, David
    Dekker, Rommert
    2007 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS 1-4, 2007, : 1637 - +
  • [43] Bi-objective scheduling on a restricted batching machine
    Cabo, Marta
    Luis Gonzalez-Velarde, Jose
    Possani, Edgar
    Rios Solis, Yasmin A.
    COMPUTERS & OPERATIONS RESEARCH, 2018, 100 : 201 - 210
  • [44] Bi-objective Optimization for Resource-constrained Robust Construction Project Scheduling
    Wanlin Liu
    Li Ge
    Chunli Qu
    Shun Yang
    KSCE Journal of Civil Engineering, 2024, 28 : 15 - 28
  • [45] Tropical optimization technique in bi-objective project scheduling under temporal constraints
    Nikolai Krivulin
    Computational Management Science, 2020, 17 : 437 - 464
  • [46] Bi-objective sizing optimization of power converter using genetic algorithms Application to photovoltaic systems
    Mejbri, Hanen
    Ammous, Kaicar
    Abid, Slim
    Morel, Herve
    Ammous, Anis
    COMPEL-THE INTERNATIONAL JOURNAL FOR COMPUTATION AND MATHEMATICS IN ELECTRICAL AND ELECTRONIC ENGINEERING, 2014, 33 (1-2) : 398 - 422
  • [47] Tropical optimization technique in bi-objective project scheduling under temporal constraints
    Krivulin, Nikolai
    COMPUTATIONAL MANAGEMENT SCIENCE, 2020, 17 (03) : 437 - 464
  • [48] Bi-Objective Optimization of Information Rate and Harvested Power in RIS-Aided SWIPT Systems
    Mohamed, Abdelhamed
    Zappone, A.
    Di Renzo, Marco
    IEEE WIRELESS COMMUNICATIONS LETTERS, 2022, 11 (10) : 2195 - 2199
  • [49] Resource-constrained project scheduling with multiple states: Bi-objective optimization model and case study of aircraft maintenance
    Chen, Gang
    He, Wen
    Tian, Yu
    Ma, Ke
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 191
  • [50] Bi-objective optimization of the scheduling of risk-related resources for risk response
    Zuo, Fei
    Zio, Enrico
    Xu, Yue
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2023, 237