Bi-objective optimization of maintenance scheduling for power systems

被引:10
|
作者
Hadjaissa, B. [1 ]
Ameur, K. [1 ]
Cheikh, S. M. Ait [2 ]
Essounbouli, N. [3 ]
机构
[1] Amar Telidji Univ, LACoSERE Lab, BP 37G,Ghardaia Rd, Laghouat 03000, Algeria
[2] Ecole Natl Polytech, LDCCP Lab, 10 Ave H Badi BP 182, Harrach Algiers, Algeria
[3] Univ Reims, CReSTIC Lab, F-10026 Troyes, France
关键词
MGA; HRPS PV/FC; Maintenance scheduling; Mono-objective optimization; Bi-objective optimization; RENEWABLE ENERGY-SYSTEMS; GENETIC ALGORITHM;
D O I
10.1007/s00170-015-8053-7
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Enhance the quality of energy production in power generating stations and reducing its cost have become of paramount importance. One of the methods to reach that goal is by minimizing the maintenance scheduling time. For this purpose, a new competitive mechanism, based on a modified genetic algorithm (MGA), has been proposed to perform the preventive maintenance (PM) scheduling. Firstly, a mono-objective optimization (makespan) has implemented, and the results were quite good. Secondly, and in order to benefit from the waste time, a bi-objective optimization was developed to find a trade-off between makespan and training time of operators. Finally, the MGA-based maintenance scheduling was tested on a hybrid renewable power system (HRPS), that uses photovoltaic modules and a fuel cell (PV/FC) as sources and the telecommunication platform as load, the obtained results have proved the high efficiency of the proposed MGA-based maintenance scheduling.
引用
收藏
页码:1361 / 1372
页数:12
相关论文
共 50 条
  • [1] Bi-objective optimization of maintenance scheduling for power systems
    B. Hadjaissa
    K. Ameur
    S. M. Ait cheikh
    N. Essounbouli
    The International Journal of Advanced Manufacturing Technology, 2016, 85 : 1361 - 1372
  • [2] Stable maintenance tasks scheduling: A bi-objective robust optimization model
    Golpira, Heris
    Tirkolaee, Erfan Babaee
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 137
  • [3] A bi-objective maintenance scheduling for power feeding substations in electrified railways
    Chen, Shao-kuan
    Ho, Tin-kin
    Mao, Bao-hua
    Bai, Yun
    TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2014, 44 : 350 - 362
  • [4] A bi-objective maintenance scheduling for power feeding substations in electrified railways
    Chen, Shao-kuan
    Ho, Tin-kin
    Mao, Bao-hua
    Bai, Yun
    Transportation Research Part C: Emerging Technologies, 2014, 44 : 350 - 362
  • [5] A bi-objective maintenance scheduling for power feeding substations in electrified railways
    Chen, Shao-kuan
    Ho, Tin-kin
    Mao, Bao-hua
    Bai, Yun
    Transportation Research Part C: Emerging Technologies, 2014, 44 : 350 - 362
  • [6] A bi-objective optimization approach for the maintenance planning of networked systems
    Li, Wanshan
    Zhang, Chi
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2020, 36 (04) : 1364 - 1385
  • [7] Modelling and optimization of a bi-objective flow shop scheduling with diverse maintenance requirements
    Seif, Javad
    Yu, Andrew Junfang
    Rahmanniyay, Fahimeh
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (09) : 3204 - 3225
  • [8] Bi-Objective Ant Colony Optimization approach to optimize production and maintenance scheduling
    Berrichi, A.
    Yalaoui, F.
    Amodeo, L.
    Mezghiche, M.
    COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (09) : 1584 - 1596
  • [9] A BI-OBJECTIVE OPTIMIZATION ALGORITHM FOR AUTOMOBILE MANUFACTURING SCHEDULING
    Alatangaowa, B.
    Batbileg, S.
    Enkhbat, R.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2020, 19 (01) : 146 - 156
  • [10] Developing a bi-objective imperfect selective maintenance optimization model for multicomponent systems
    Diallo, C.
    Khatab, A.
    Venkatadri, U.
    IFAC PAPERSONLINE, 2019, 52 (13): : 1079 - 1084