Holonic Construction Management: Unified Framework for ICT-Supported Process Control

被引:20
|
作者
Zekavat, Payam R. [1 ]
Moon, Sungkon [1 ]
Bernold, Leonhard E. [2 ]
机构
[1] Univ New S Wales, Sch Civil & Environm Engn, Sydney, NSW 2052, Australia
[2] Univ Tecn FSM, Dept Civil Engn, Valparaiso 1680, Chile
关键词
Holarchy; Holonic construction management; Rebar supply; Master bundle; Blind lift; Video interface; Hands-free intercom; Electronic construction kiosk; Crane safety; SYSTEM; PROPAGATION; PROJECTS; CRANES; MODEL;
D O I
10.1061/(ASCE)ME.1943-5479.0000316
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Communication in construction still depends on a communication network much like the Romans used, face-to-face meetings and paper. Not surprisingly, this situation has been identified as an inhibitor to increasing productivity and a source of miscommunication, rework, and avoidable accidents. This paper will present a holonic construction management (HCM) model allowing the inclusion of multitype holons organized in resource clusters as well as flowing construction material carrying with it critical information. HCM was successfully tested to provide smooth interface between five different types of holons: (1)equipment, (2)human laborer/operator, (3)material, (4)three-dimensional (3D) space, and (5)information/supply logistics. Results also illustrate the potential of the HCM to integrate the many information and communication technology (ICT) applications into a resilient construction environment where electronic designs are turned into physical products. The results of initial site observations as well as safety statistics were used to identify the most important problem areas. Comparative work studies provided the means to measure differences in performance between traditional and HCM-enhanced approaches. The analysis of the field study results highlighted the effectiveness of a key element of HCM, the creation of new communication corridors between previously disconnected production units or holon. The hardware testing under field conditions highlighted the difficulties of embedding modern ICT systems into the rugged environment of construction as well as the human responses to the changes. Finally, the successful realization of HCM for the rebar supply management emphasized the need for a reevaluation of the traditional contractual relationships as the large gains will not benefit all the participants evenly. (C) 2014 American Society of Civil Engineers.
引用
收藏
页数:15
相关论文
共 50 条
  • [41] Combining SABSA and Vis4Sec to the Process Framework IdMSecMan to Continuously Improve Identity Management Security in Heterogeneous ICT Infrastructures
    Poehn, Daniela
    Seeber, Sebastian
    Hommel, Wolfgang
    APPLIED SCIENCES-BASEL, 2023, 13 (04):
  • [42] Methods and Means of Intellectual Planning: Implementation of the Management of Process Control in the Construction of an Integrated Expert System
    Rybina, G. V.
    Blokhin, Yu. M.
    SCIENTIFIC AND TECHNICAL INFORMATION PROCESSING, 2015, 42 (06) : 432 - 447
  • [43] The Over-all Process Management Measures Based on Source Control of City Construction Rubbish
    Liu Ying
    Lin Hao
    PROCEEDINGS OF THE 2009 INTERNATIONAL CONFERENCE ON PUBLIC ECONOMICS AND MANAGEMENT (ICPEM 2009), VOL 5: STATISTICS AND METHODOLOGY, 2009, : 106 - 109
  • [44] Management control structures and performance implications in international construction joint ventures: critical survey and conceptual framework
    Tetteh, Mershack Opoku
    Chan, Albert P. C.
    Ameyaw, Ernest Effah
    Darko, Amos
    Yevu, Sitsofe Kwame
    Boateng, Emmanuel B.
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2022, 29 (02) : 755 - 781
  • [45] A study of management control introducing process in SME using the strategic analysis framework of Crozier and Friedberg
    Nobre, Thierry
    Zawadzki, Cindy
    COMPTABILITE CONTROLE AUDIT, 2013, 19 (01): : 91 - 116
  • [46] Strategic management and risk control of emergency hospital construction: SWOT and STPA framework from a systems thinking perspective
    Zhu, Dongliang
    Wang, Song
    Li, Yaru
    PLOS ONE, 2023, 18 (11):
  • [47] Scope Management and Change Control Process Study for Project-Based Companies in the Construction and Engineering Industries
    Alp, Neslihan
    Stack, Banning
    PICMET '12: PROCEEDINGS - TECHNOLOGY MANAGEMENT FOR EMERGING TECHNOLOGIES, 2012, : 2427 - 2436
  • [49] CONSTRUCTION OF AN EVALUATION INDEX SYSTEM FOR INFECTION CONTROL IN A HEMATOPOIETIC STEM CELL TRANSPLANTATION WARD BASED ON PROCESS MANAGEMENT
    Wang, Ying
    Zhu, Liying
    Jiang, Yanhua
    BONE MARROW TRANSPLANTATION, 2024, 59 : 722 - 722
  • [50] Comprehensive Evaluation on the Control of Smart Distribution Network Project Investment Based on Cooperation Management during the Construction Process
    Zhang Shuangying
    Liu Dunnan
    Ju Song
    Ji Lihang
    Pan Jin
    PROCEEDINGS OF THE 2015 INTERNATIONAL SYMPOSIUM ON ENERGY SCIENCE AND CHEMICAL ENGINEERING (ISESCE 2015), 2016, 45 : 46 - 50