共 50 条
- [41] Combining SABSA and Vis4Sec to the Process Framework IdMSecMan to Continuously Improve Identity Management Security in Heterogeneous ICT Infrastructures APPLIED SCIENCES-BASEL, 2023, 13 (04):
- [43] The Over-all Process Management Measures Based on Source Control of City Construction Rubbish PROCEEDINGS OF THE 2009 INTERNATIONAL CONFERENCE ON PUBLIC ECONOMICS AND MANAGEMENT (ICPEM 2009), VOL 5: STATISTICS AND METHODOLOGY, 2009, : 106 - 109
- [45] A study of management control introducing process in SME using the strategic analysis framework of Crozier and Friedberg COMPTABILITE CONTROLE AUDIT, 2013, 19 (01): : 91 - 116
- [47] Scope Management and Change Control Process Study for Project-Based Companies in the Construction and Engineering Industries PICMET '12: PROCEEDINGS - TECHNOLOGY MANAGEMENT FOR EMERGING TECHNOLOGIES, 2012, : 2427 - 2436
- [50] Comprehensive Evaluation on the Control of Smart Distribution Network Project Investment Based on Cooperation Management during the Construction Process PROCEEDINGS OF THE 2015 INTERNATIONAL SYMPOSIUM ON ENERGY SCIENCE AND CHEMICAL ENGINEERING (ISESCE 2015), 2016, 45 : 46 - 50