A comparison between basic cyclic scheduling and variable cyclic scheduling in a two-stage hybrid flow shop

被引:10
|
作者
Tsubone, H
Suzuki, M
Uetake, T
Ohba, M
机构
[1] Tokyo Metropolitan Inst Technol, Hino, Tokyo 1910065, Japan
[2] Iwate Prefectual Univ, Takizawa, Iwate 0200173, Japan
[3] Konica Corp Ltd, Hino, Tokyo 1910065, Japan
关键词
lot sizing; operations and production management; repetitive manufacturing; and simulation;
D O I
10.1111/j.1540-5915.2000.tb00930.x
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper the impacts of two types of repetitive scheduling systems on the makespan in a two-stage hybrid flow shop, which consists of one machine in the first stage and multiple process lines in the second stage, are compared. First, we analyzed, through a simulation, how the makespan is affected by the setup frequency and sequencing rules for products under two types of scheduling systems: One is repetitive scheduling with only one batch per product family per scheduling cycle (basic cyclic scheduling system). The other is repetitive cyclic scheduling with various batches per product family per scheduling cycle (variable cyclic scheduling system). Second, we compared which scheduling system is superior under various manufacturing situations. The following points were noted. (1) The superior scheduling system can be shown by a two-dimensional diagram of the setup frequency and the imbalance in workload for processing among process lines in the second stage. (2) Variable cyclic scheduling is superior in comparison with basic cyclic scheduling when there is a large imbalance in the workload to be processed among process lines in the second stage, or the workload in the second stage is larger than that in the first stage. The result of this research provides guidelines for selecting which scheduling system should be adopted.
引用
收藏
页码:197 / 222
页数:26
相关论文
共 50 条
  • [21] BATCH SCHEDULING IN A TWO-STAGE FLEXIBLE FLOW SHOP PROBLEM
    Gerstl, Enrique
    Mosheiov, Gur
    Sarig, Assaf
    FOUNDATIONS OF COMPUTING AND DECISION SCIENCES, 2014, 39 (01) : 3 - 16
  • [22] A hybrid scheduling approach for a two-stage flexible flow shop with batch processing machines
    Yi Tan
    Lars Mönch
    John W. Fowler
    Journal of Scheduling, 2018, 21 : 209 - 226
  • [23] Scheduling in aerospace composite manufacturing systems: a two-stage hybrid flow shop problem
    Aria Azami
    Kudret Demirli
    Nadia Bhuiyan
    The International Journal of Advanced Manufacturing Technology, 2018, 95 : 3259 - 3274
  • [24] A note on scheduling of two-stage flow shop with multiple processors
    Suresh, V
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1997, 49 (01) : 77 - 82
  • [25] On the connection between a cyclic job shop and a reentrant flow shop scheduling problem
    Steiner, George
    Xue, Zhihui
    JOURNAL OF SCHEDULING, 2006, 9 (04) : 381 - 387
  • [26] Block approach to the cyclic flow shop scheduling
    Bozejko, Wojciech
    Uchronski, Mariusz
    Wodecki, Mieczyslaw
    COMPUTERS & INDUSTRIAL ENGINEERING, 2015, 81 : 158 - 166
  • [27] A genetic algorithm for two-stage no-wait hybrid flow shop scheduling problem
    Wang, Shijin
    Liu, Ming
    COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (04) : 1064 - 1075
  • [28] Evaluation Dispatching Rules for Two-Stage Hybrid Flow Shop Scheduling with Parallel Machines
    Kaweegitbundit, Parinya
    MECHANICAL ENGINEERING AND MATERIALS, PTS 1-3, 2012, 152-154 : 1487 - 1491
  • [29] Heuristic algorithms for multiprocessor task scheduling in a two-stage hybrid flow-shop
    Oguz, C
    Ercan, MF
    Cheng, TCE
    Fung, YF
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 149 (02) : 390 - 403
  • [30] An approximation scheme for heterogeneous parallel task scheduling in a two-stage hybrid flow shop
    School of Information Science and Engineering, Northeastern University, Shengyang
    110004, China
    J. Inf. Sci. Eng., 4 (1291-1308):