Tabu search for scheduling on identical parallel machines to minimize mean tardiness

被引:38
|
作者
Armentano, VA [1 ]
Yamashita, DS [1 ]
机构
[1] Univ Estadual Campinas, Fac Engn Elect & Comp, BR-13083970 Campinas, SP, Brazil
关键词
scheduling; parallel machines; due date; tardiness; heuristic; tabu search;
D O I
10.1023/A:1008918229511
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper presents a tabu search approach for scheduling jobs on identical parallel machines with the objective of minimizing the mean tardiness. Initially, we consider a basic tabu search that uses short term memory only. Local search is performed on a neighborhood defined by two types of moves. Insert moves consist of transferring each job from one machine to another and swap moves are those obtained by exchanging each pair of jobs between two machines. Next, we analyze the incorporation of two diversification strategies with the aim of exploring unvisited regions of the solution space. The first strategy uses long term memory to store the frequency of the moves executed throughout the search and the second makes use of influential moves. Computational tests are performed on problems with up to 10 machines and 150 jobs. The heuristic performance is evaluated through a lower bound given by Lagrangean relaxation. A comparison is also made with respect to the best constructive heuristic reported in the literature.
引用
收藏
页码:453 / 460
页数:8
相关论文
共 50 条
  • [41] Tardiness Scheduling with Fuzzy Processing Time Using Tabu Search
    Yang, Hongbing
    Li, Wenchao
    Guan, Xianping
    Zhou, Fei
    ADVANCED MANUFACTURING TECHNOLOGY, PTS 1-4, 2012, 472-475 : 2279 - +
  • [42] Tabu search for total tardiness minimization in flowshop scheduling problems
    Armentano, VA
    Ronconi, DP
    COMPUTERS & OPERATIONS RESEARCH, 1999, 26 (03) : 219 - 235
  • [43] A Simulated Annealing Approach for the Non-Identical Parallel Batch Processing Machines to Minimize Total Weighted Tardiness
    Godhandaraman, P.
    Poongothai, V.
    Vinitha, G.
    11TH NATIONAL CONFERENCE ON MATHEMATICAL TECHNIQUES AND APPLICATIONS, 2019, 2112
  • [44] Scheduling to minimize mean tardiness and weighted mean tardiness in flowshop and flowline-based manufacturing cell
    Parthasarathy, S
    Rajendran, C
    COMPUTERS & INDUSTRIAL ENGINEERING, 1998, 34 (02) : 531 - 546
  • [45] A tabu search algorithm for parallel machine total tardiness problem
    Bilge, Ü
    Kiraç, F
    Kurtulan, M
    Pekgün, P
    COMPUTERS & OPERATIONS RESEARCH, 2004, 31 (03) : 397 - 414
  • [46] Batch scheduling of identical jobs on parallel identical machines
    Mor, Baruch
    Mosheiov, Gur
    INFORMATION PROCESSING LETTERS, 2012, 112 (20) : 762 - 766
  • [47] Inference search algorithm for optimizing scheduling and minimizing mean tardiness in parallel joint robots
    Tamizi, Saman
    Ghaffari, Ali
    JOURNAL OF AMBIENT INTELLIGENCE AND HUMANIZED COMPUTING, 2019, 10 (12) : 4771 - 4783
  • [48] Inference search algorithm for optimizing scheduling and minimizing mean tardiness in parallel joint robots
    Saman Tamizi
    Ali Ghaffari
    Journal of Ambient Intelligence and Humanized Computing, 2019, 10 : 4771 - 4783
  • [49] Tabu Search Algorithm Based on Lower Bound and Exact Algorithm Solutions for Minimizing the Makespan in Non-Identical Parallel Machines Scheduling
    Noman, Mohammed A.
    Alatefi, Moath
    Al-Ahmari, Abdulrahman M.
    Ali, Tamer
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [50] Scheduling with earliness-tardiness penalties and parallel machines
    Rios-Solis, Yasmin A.
    4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2008, 6 (02): : 191 - 194