共 50 条
- [41] Two-agent scheduling of time-dependent jobs Journal of Combinatorial Optimization, 2017, 34 : 362 - 377
- [43] Grade-two resistance screw shear connector behaviour for a composite section system INGENIERIA E INVESTIGACION, 2008, 28 (02): : 4 - 14
- [47] Model of time-dependent network paths and two-level optimal intelligent algorithm Tiedao Xuebao, 2008, 1 (32-37):