Direct Subsidy Incentive Capacity Restoration Contract under Supply Disruption Risk

被引:0
|
作者
Li, Jianbin [1 ]
Zheng, Zhong [1 ]
Chen, Zhiyuan [2 ]
机构
[1] Huazhong Univ Sci & Technol, Sch Management, Wuhan, Peoples R China
[2] Wuhan Univ, Sch Econ & Management, Wuhan, Peoples R China
关键词
supply disruption; incentive contract; capacity restoration; CHAIN;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Consider a supply chain consists of a supplier and a buyer. The supplier faces a risk of disruption and could rebuild the capacity if he has invested before the disruption. To motivate the supplier to invest and share the burden of capacity restoration, the buyer adopts a direct subsidy incentive contract. For this incentive contract, the buyer provides financial subsidy to share the capacity restoration cost of the supplier if there is a disruption. We also consider contract timing problem. We compare the Ex Post commitment strategy (the incentive contract is offered after disruption) and Ex Ante commitment strategy (the incentive contract is offered before disruption). We find that Ex Ante commitment strategy dominates Ex Post commitment strategy because it provides a wider parameter range for the investment decision of the supplier, and leads to profit improvement for both the supplier and the buyer.
引用
收藏
页数:6
相关论文
共 50 条
  • [31] Commitment strategies and inventory decisions under supply disruption risk
    Wu, Lezhen
    Wu, Xiaole
    Zhou, Yu
    PRODUCTION AND OPERATIONS MANAGEMENT, 2023, 32 (08) : 2619 - 2637
  • [32] Transshipment contract for coordination of a green dual-channel supply chain under channel disruption
    Aslani, Amin
    Heydari, Jafar
    JOURNAL OF CLEANER PRODUCTION, 2019, 223 : 596 - 609
  • [33] Supply chain wholesale price contract with two competing retailers under asymmetric information and disruption
    Zhuang, Pin
    Zhao, Lindu
    Dongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Southeast University (Natural Science Edition), 2007, 37 (SUPPL. 2): : 413 - 419
  • [34] MAKE-TO-ORDER CONTRACT WITH A BACKUP SUPPLIER UNDER RECURRENT SUPPLY UNCERTAINTIES AND DISRUPTION RISKS
    Hou, Jing
    Zeng, Amy Z.
    Zhao, Lindu
    INTERNATIONAL JOURNAL OF INNOVATIVE COMPUTING INFORMATION AND CONTROL, 2009, 5 (12A): : 4479 - 4489
  • [35] Coordination and optimization decision of assembly building supply chain under supply disruption risk
    Liu, Zheng
    Huang, Na
    Qian, Qingshan
    Zhao, Yuanjun
    Yang, Tianchen
    Han, Chunjia
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2024, 15 (04) : 909 - 930
  • [36] Research on Investment and Coordination Strategies for Supply Chain Resilience under Supply Disruption Risk
    Luo, Xiaochun
    Kang, Kai
    Lu, Lin
    Ke, Youan
    SYMMETRY-BASEL, 2024, 16 (09):
  • [37] A novel mechanism in a dual-sourcing supply chain with supply disruption risk: The fraction-committed procurement contract
    Zhou, Wenhui
    Yang, Hongmei
    Dang, Yuanyuan
    Niu, Baozhuang
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 186
  • [38] Optimal policy for a periodic-review inventory system under a supply capacity contract
    Chao, Xiuli
    Zipkin, Paul H.
    OPERATIONS RESEARCH, 2008, 56 (01) : 59 - 68
  • [39] Joint replenishment and pricing decisions with different freight modes considerations for a supply chain under a composite incentive contract
    Noori-daryan, Mahsa
    Taleizadeh, Ata Allah
    Govindan, Kannan
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2018, 69 (06) : 876 - 894
  • [40] Research on contract coordination and price decision of closed-loop supply chain under disruption condition
    Wang, Yinhe
    Wang, Xu
    Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2013, 49 (16): : 185 - 192