A project-oriented production model of batch plants

被引:5
|
作者
Martinez, EC [1 ]
Perez, GA [1 ]
机构
[1] INGAR Inst Desarrollo & Diseno, RA-3000 Santa Fe, Argentina
关键词
batch process; process task network; decentralization;
D O I
10.1016/S0098-1354(97)00225-1
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper presents a project-oriented framework for interactive analysis of the feasible plans and schedules that can provide an effective/efficient flow of orders within a batch process. The proposed approach is based on a hierarchical project-oriented production model that integrates production planning with short-term scheduling and resource leveling, At the highest layer of the hierarchy, the use of aggregate activities and their milestone dates is aimed to emphasize a management perspective of the production model. As a core element of the model a process task network is used. Each node of this network is expanded further into sub-tasks and their detailed schedules. Efficiency in resource's usage during short-term scheduling is improved by changing process task durations. The implementation of the project-oriented production planning methodology has been based on the existing literature in project management (Leachman, 1982, Leachman, 1983; Hackman and Leachman, 1989), but many alternative techniques can be used for specific layers (sub-problems) of the proposed hierarchy. An attractive feature of the project oriented approach is that descentralized decision making is favored. Conflicts between management objectives and shop-floor decisions are solved iteratively in a two-tier scheme. Simple examples are considered to illustrate the potentials and advantages of the project-oriented approach. (C) 1998 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:391 / 414
页数:24
相关论文
共 50 条