Linear programming models with planned lead times for Supply Chain Operations Planning

被引:67
|
作者
Spitter, JM
Hurkens, CAJ
de Kok, AG
Lenstra, JK
Negenman, EG
机构
[1] Eindhoven Univ Technol, Dept Technol Management, NL-5600 MB Eindhoven, Netherlands
[2] Eindhoven Univ Technol, Dept Math & Comp Sci, NL-5600 MB Eindhoven, Netherlands
关键词
Supply Chain Management; production planning; material requirements planning; linear programming;
D O I
10.1016/j.ejor.2004.01.019
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper contributes to the development of models for capacity constrained Supply Chain Operations Planning (SCOP). We focus on production environments with arbitrary supply chain structures. The demand for the end items is assumed to be exogenously determined. We solve the SCOP problem with Linear Programming models using planned lead times with multi-period capacity consumption. Using planned lead times increases the reliability of the communication between SCOP and Scheduling with regard to the feasibility of the planning. Planned lead times also reduce the nervousness in the system. We model capacity constraints on the quantity of items that can be assembled within a time interval. In particular, items can be assigned to multiple resources. We discuss two LP approaches which plan the production of items so that a sum of inventory costs and costs due to backordering is minimized, (C) 2004 Elsevier B.V. All rights reserved.
引用
收藏
页码:706 / 720
页数:15
相关论文
共 50 条
  • [31] Advanced sales and operations planning framework in a company supply chain
    Wang, Jun-Zhong
    Hsieh, Su-Tzu
    Hsu, Ping-Yu
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2012, 25 (03) : 248 - 262
  • [32] Work-in-process clearing in supply chain operations planning
    Selcuk, B.
    Fransoo, J. C.
    De Kok, A. G.
    IIE TRANSACTIONS, 2008, 40 (03) : 206 - 220
  • [33] A probabilistic bi-level linear multi-objective programming problem to supply chain planning
    Roghanian, E.
    Sadjadi, S. J.
    Aryanezhad, M. B.
    APPLIED MATHEMATICS AND COMPUTATION, 2007, 188 (01) : 786 - 800
  • [34] On the research of linear programming solving methods for non-hierarchical spare parts supply chain planning
    Pires, Matheus Cardoso
    Frazzon, Enzo Morosini
    IFAC PAPERSONLINE, 2016, 49 (30): : 198 - 203
  • [35] Robust optimization and mixed-integer linear programming model for LNG supply chain planning problem
    Arun Kumar Sangaiah
    Erfan Babaee Tirkolaee
    Alireza Goli
    Saeed Dehnavi-Arani
    Soft Computing, 2020, 24 : 7885 - 7905
  • [36] Robust optimization and mixed-integer linear programming model for LNG supply chain planning problem
    Sangaiah, Arun Kumar
    Tirkolaee, Erfan Babaee
    Goli, Alireza
    Dehnavi-Arani, Saeed
    SOFT COMPUTING, 2020, 24 (11) : 7885 - 7905
  • [37] A Solution to Interval Linear Bi-level Programming and Its Application in Decentralized Supply Chain Planning
    Wang, Jianzhong
    Du, Gang
    IEEE/SOLI'2008: PROCEEDINGS OF 2008 IEEE INTERNATIONAL CONFERENCE ON SERVICE OPERATIONS AND LOGISTICS, AND INFORMATICS, VOLS 1 AND 2, 2008, : 2035 - 2038
  • [38] Advances in stochastic programming and robust optimization for supply chain planning
    Govindan, Kannan
    Cheng, T. C. E.
    COMPUTERS & OPERATIONS RESEARCH, 2018, 100 : 262 - 269
  • [39] Probabilistic programming models for traffic incident management operations planning
    Ozbay, Kaan
    Iyigun, Cem
    Baykal-Gursoy, Melike
    Xiao, Weihua
    ANNALS OF OPERATIONS RESEARCH, 2013, 203 (01) : 389 - 406
  • [40] Probabilistic programming models for traffic incident management operations planning
    Kaan Ozbay
    Cem Iyigun
    Melike Baykal-Gursoy
    Weihua Xiao
    Annals of Operations Research, 2013, 203 : 389 - 406