MACHINE PROTECTION STRATEGY FOR LHC COMMISSIONING AND OUTLOOK FOR FUTURE CHALLENGES

被引:0
|
作者
Salvachua, B. [1 ]
Bracco, C. [1 ]
Bruce, R. [1 ]
Chetvertkova, V [1 ]
Ponce, L. [1 ]
Redaelli, S. [1 ]
Schmidt, R. [1 ]
Uythoven, J. [1 ]
Valentino, G. [1 ]
Wenninger, J. [1 ]
Wollmann, D. [1 ]
Zerlauth, M. [1 ]
机构
[1] CERN, Geneva, Switzerland
关键词
D O I
暂无
中图分类号
O412 [相对论、场论]; O572.2 [粒子物理学];
学科分类号
摘要
During Run 2, when operating at 6.5 TeV and 25 ns bunch spacing, the LHC will accelerate and store beams with an energy of up to 372MJ. A very tiny fraction of this beam can cause severe damage to accelerator equipment if the energy is released in an uncontrolled way. The note addresses the machine protection considerations for the initial commissioning with and without beam and discusses the required (re-)qualifications for subsequent changes of beam/optics parameters during the run. The definition of the new setup beam intensity - impacting commissioning and later operation and machine developments - is recalled. The note will conclude with an outlook on future challenges with respect to machine protection in view of the injector upgrade and HL-LHC.
引用
收藏
页码:134 / 137
页数:4
相关论文
共 50 条
  • [1] The LHC machine: from beam commissioning to operation and future upgrades
    Giovannozzi, Massimo
    THEORETICAL PHYSICS TO FACE THE CHALLENGE OF LHC, 2015, : 35 - 66
  • [2] Turning on the LHC: Commissioning with beam and the outlook for 2010
    Lamont, M.
    NUOVO CIMENTO C-COLLOQUIA AND COMMUNICATIONS IN PHYSICS, 2010, 33 (05): : 115 - 122
  • [3] LHC machine protection
    Schmidt, R.
    Assmann, R.
    Carlier, E.
    Dehning, B.
    Denz, R.
    Goddard, B.
    Holzer, E. B.
    Kain, V.
    Puccio, B.
    Todd, B.
    Uythoven, J.
    Wenninger, J.
    Zerlauth, M.
    2007 IEEE PARTICLE ACCELERATOR CONFERENCE, VOLS 1-11, 2007, : 3683 - 3687
  • [4] The SNS machine protection system: Early commissioning results and future plans
    Sibley, C
    Armstrong, D
    Jones, A
    Justice, A
    Thompson, D
    2005 IEEE PARTICLE ACCELERATOR CONFERENCE (PAC), VOLS 1-4, 2005, : 2030 - 2032
  • [5] Commissioning of quench protection instruments in the LHC superconducting circuits
    Skoczen, Andrzej
    Skala, Aleksander
    PRZEGLAD ELEKTROTECHNICZNY, 2009, 85 (07): : 73 - 77
  • [7] STRATEGY FOR THE FIRST TWO MONTHS OF LHC BEAM COMMISSIONING (COMMISSIONING TO FIRST STABLE BEAMS)
    Redaelli, S.
    Arduini, G.
    Giovannozzi, M.
    Lamont, M.
    Tomas, R.
    Wenninger, J.
    CHAMONIX 2014: WORKSHOP ON LHC PERFORMANCE, 2015, : 125 - 128
  • [8] Future Outlook for Data Protection.
    Ekberg, Jan
    Sahko, 1985, 58 (05): : 30 - 36
  • [9] SCIENCE - CHALLENGES OF TODAY - OUTLOOK FOR FUTURE
    CARLSON, HJ
    SCIENCE, 1974, 183 (4120) : 104 - 104
  • [10] The future outlook and challenges for smelting aluminium
    Taylor, Mark P.
    Welch, Barry J.
    Aluminium International Today, 2004, 16 (02): : 20 - 24