A hierarchical model in short-term hydro scheduling with unit commitment and head-dependency

被引:15
|
作者
Cheng, Xianliang [1 ]
Feng, Suzhen [2 ]
Zheng, Hao [2 ]
Wang, Jinwen [2 ]
Liu, Shuangquan [3 ]
机构
[1] Power Dispatch & Control Ctr China Southern Power, Guangzhou 510663, Guangdong, Peoples R China
[2] Huazhong Univ Sci & Technol, Sch Civil & Hydraul Engn, Wuhan 430074, Hubei, Peoples R China
[3] Yunnan Elect Power Dispatch & Control Ctr, Kunming 650011, Yunnan, Peoples R China
关键词
Short -term hydro scheduling; Unit commitment; Head-dependency; Mixed integer linear programming; Water head updating; Cascaded reservoirs; OPTIMIZATION; SYSTEMS; OPERATION; ALGORITHM;
D O I
10.1016/j.energy.2022.123908
中图分类号
O414.1 [热力学];
学科分类号
摘要
The short-term hydro scheduling (STHS) problem has long been studied for decades, with great efforts having been made on improving their solution methods or algorithms. This work instead aims to solve a real-world problem with a hierarchical modeling strategy presented to decouple the STHS problem into two sub-problems: a load distribution (LD) and a unit commitment (UC), which are both solved with the Mixed Integer Linear Programming (MILP) and then coordinated through their coupling variables. The linearity errors in the model can be eliminated with an efficient successive water head updating pro-cedure that adjusts the searching range based on the improvement of the objective. Taking into account the hydraulic connection, unit operating zones, head-dependency, generation and water level targets, the optimal quarter-hourly schedule for Lancang Cascade that consists of 11 hydropower reservoirs and 56 units can be obtained in 1 min for not only all the hydro-plants in the cascade but also every unit within hydro plant. The application results demonstrate that the convergence of the water head updating procedure is intermittent yet guaranteed after about 20 iterations.(c) 2022 Elsevier Ltd. All rights reserved.
引用
收藏
页数:16
相关论文
共 50 条
  • [41] Short-Term Operational Scheduling of Unit Commitment Using Binary Alternative Moth-Flame Optimization
    Kigsirisin, Soraphon
    Miyauchi, Hajime
    IEEE ACCESS, 2021, 9 : 12267 - 12281
  • [42] Multiple Time Resolution Unit Commitment for Short-Term Operations Scheduling Under High Renewable Penetration
    Bakirtzis, Emmanouil A.
    Biskas, Pandelis N.
    Labridis, Dimitris P.
    Bakirtzis, Anastasios G.
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2014, 29 (01) : 149 - 159
  • [43] PROMOTING THE APPLICATION OF EXPERT SYSTEMS IN SHORT-TERM UNIT COMMITMENT
    LI, S
    SHAHIDEHPOUR, SM
    WANG, C
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1993, 8 (01) : 286 - 292
  • [44] Unit Commitment using Nearest Neighbor as a Short-Term Proxy
    Dalal, Gal
    Gilboa, Elad
    Mannor, Shie
    Wehenkel, Louis
    2018 POWER SYSTEMS COMPUTATION CONFERENCE (PSCC), 2018,
  • [45] SHORT-TERM UNIT COMMITMENT WITH SIMPLIFIED ECONOMIC-DISPATCH
    CHEN, CL
    CHEN, SL
    ELECTRIC POWER SYSTEMS RESEARCH, 1991, 21 (02) : 115 - 120
  • [47] A hybrid chaotic genetic algorithm for short-term hydro system scheduling
    Yuan, XH
    Yuan, YB
    Zhang, YC
    MATHEMATICS AND COMPUTERS IN SIMULATION, 2002, 59 (04) : 319 - 327
  • [48] Short-term hydro generation and interchange contract scheduling for Swiss Rail
    Awobamise, B
    Frowd, RJ
    Rahimi, FA
    Tong, S
    Aganagic, M
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (01) : 274 - 280
  • [49] Immune algorithm and its application in short-term scheduling of hydro plant
    Center of Energy Development Research, Sichuan University, Chengdu 610065, China
    Shuili Fadian Xuebao, 2006, 6 (21-25):
  • [50] Dynamic incorporation of nonlinearity into MILP formulation for short-term hydro scheduling
    Skjelbred, Hans Ivar
    Kong, Jiehong
    Fosso, Olav Bjarte
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2020, 116