Study on Production Process of New U-shaped Canal

被引:0
|
作者
Sun, Jinglu [1 ]
Zhang, Shoujie [1 ]
Zhang, Bin [1 ]
Liu, Lijia [1 ]
机构
[1] Heilongjiang Acad Water Conservancy, Heilongjiang Prov Key Lab Engn Seasonal Frozen So, Heilongjiang 150080, Peoples R China
关键词
Production Process; U-shaped canal; water conservancy project;
D O I
10.4028/www.scientific.net/AMM.675-677.947
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
To solve the problem in the process of prefabrication of U-shaped canal, this paper mainly introduces the U-shaped canal production line that adopts production process of flowing water machine and continuous curing method. The production process can adapt to a variety of specifications U 300 - U1000 (length of concrete U-shaped canal products is 2000mm). Tank production line has production capacity of concrete U-shaped canal of 100 cubic meters every day. The production line can automatically run, in each location as well as human intervention, easy to control the production rhythm and production organization and management. Through the process, making the U-shaped canal can be manufactured in large-scale. It can play an important role in national food security, steady and rapid economic development and social harmony and stability on basis of water conservancy.
引用
收藏
页码:947 / 950
页数:4
相关论文
共 50 条
  • [21] Effect of manufacturing new U-shaped electrode on die sinking EDM process performance
    Fantoni, Gualtiero
    Alrubaye, Israa Dheyaa Khalaf
    Baccelli, Livio
    MACHINING SCIENCE AND TECHNOLOGY, 2024, 28 (06) : 1039 - 1067
  • [22] Springback Calibration of a U-Shaped Electromagnetic Impulse Forming Process
    Cui, Xiaohui
    Zhang, Zhiwu
    Yu, Hailiang
    Xiao, Xiaoting
    Cheng, Yongqi
    METALS, 2019, 9 (05)
  • [23] U-shaped learning: a new model for transdisciplinary education
    O'Sullivan, Gemma
    HUMANITIES & SOCIAL SCIENCES COMMUNICATIONS, 2025, 12 (01):
  • [24] A New Formula for Critical Depth of the U-shaped channels
    Li, Fengling
    Wen, Hui
    Lin, Xuguan
    ADVANCES IN HYDROLOGY AND HYDRAULIC ENGINEERING, PTS 1 AND 2, 2012, 212-213 : 1136 - 1140
  • [25] Optimal allocation of heterogeneous workers in a U-shaped production line
    Nakade, Koichi
    Nishiwaki, Rei
    COMPUTERS & INDUSTRIAL ENGINEERING, 2008, 54 (03) : 432 - 440
  • [27] Production logistics and ergonomic evaluation of U-shaped assembly systems
    Zuelch, Michael
    Zuelch, Gert
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2017, 190 : 37 - 44
  • [28] Stochastic analysis of a U-shaped production line with multiple workers
    Nakade, K
    Ohno, K
    COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 33 (3-4) : 809 - 812
  • [29] Bounds and approximations for cycle times of a U-shaped production line
    Nakade, K
    Ohno, K
    Shanthikumar, JG
    OPERATIONS RESEARCH LETTERS, 1997, 21 (04) : 191 - 200
  • [30] An optimal worker allocation problem for a U-shaped production line
    Nakade, K
    Ohno, K
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1999, 60-1 : 353 - 358