Simulation Research for the Influence of Mining Sequence on Coal Pillar Stability under Highwall Mining Method

被引:4
|
作者
Huang, Jing [1 ]
Meng, Fanbao [1 ]
Wang, Ge [2 ]
Wu, Yingkui [2 ]
Wen, Jinhao [3 ]
机构
[1] Shandong Univ Sci & Technol, Coll Energy & Min Engn, Qingdao 266590, Shandong, Peoples R China
[2] Taian Taishuo Strata Control Technol Co Ltd, Tai An 271000, Shandong, Peoples R China
[3] China Univ Min & Technol Beijing, Sch Mech & Civil Engn, Beijing 100083, Peoples R China
关键词
DESIGN;
D O I
10.1155/2021/8864339
中图分类号
P3 [地球物理学]; P59 [地球化学];
学科分类号
0708 ; 070902 ;
摘要
Highwall mining, which is referred to the technique of extracting coal from the bottom of an exposed highwall, features safety, efficiency, and economy. According to existing highwall mining methods, the mining sequence has a great influence on highwall stability. Based on a highwall mining project in Australia, this study adopted the FLAC(3D) numerical simulation method to investigate the stability of coal pillars with different mining sequences. The results show that different mining sequences of boreholes exert a great effect on highwall stability. Compared with sequential mining, the skip mining method achieves higher speed of highwall stabilization and smaller plastic zone of coal pillar with its maximum strength decreasing by 12%. By adjusting the mining sequence scientifically, the coal pillar failure and roof collapse caused by the deviation of mining angle can be avoided. The results may provide a new angle for the studies on the coal pillar layout and stability design in highwall mining.
引用
收藏
页数:9
相关论文
共 50 条
  • [41] Slope stability calculation method for highwall mining with open-cut mines
    Jiang, Juyu
    Lu, Ye
    Wang, Dong
    Han, Xinping
    SCIENTIFIC REPORTS, 2022, 12 (01)
  • [42] Effect of width of gallery of highwall mining on stability of highwall: A numerical modelling approach
    Chandar, Karra Ram
    Kumar, B. Gowtham
    International Journal of Mining and Mineral Engineering, 2014, 5 (03) : 212 - 228
  • [43] Stability analysis of rib pillars in highwall mining under dynamic and static loads in open-pit coal mine
    Haoshuai Wu
    Yanlong Chen
    Haoyan Lv
    Qihang Xie
    Yuanguang Chen
    Jun Gu
    International Journal of Coal Science & Technology, 2022, 9
  • [44] The Numerical Simulation Study of the Influence on Stability of Slope by Underground - mining under Opencast Coal Mine Slope
    Gao Ying
    Lu Guobin
    PROCEEDINGS OF THE 4TH INTERNATIONAL SYMPOSIUM ON MINE SAFETY (2012), 2012, : 269 - 273
  • [45] Slope stability calculation method for highwall mining with open-cut mines
    Juyu Jiang
    Ye Lu
    Dong Wang
    Xinping Han
    Scientific Reports, 12
  • [46] Stability of Coal Pillar and Roof Movement Characteristics in Roadway Backfill Mining
    Lin, Hai
    Yang, Renshu
    Li, Yongliang
    Fang, Shizheng
    ADVANCES IN CIVIL ENGINEERING, 2021, 2021
  • [47] Numerical simulation study on the failure characteristics of the combined structure of residual coal pillar and roof in room and pillar mining method
    Du, Er-Bao
    Zhou, Xiao-Ping
    Zhou, Nan
    ENGINEERING FAILURE ANALYSIS, 2025, 174
  • [48] A non-coal pillar mining method by concrete carrier replacing coal pillar: a case study
    Jinpeng Zhang
    Limin Liu
    Jun Shao
    Arabian Journal of Geosciences, 2022, 15 (10)
  • [49] Research on Movement and Deformation of Rock Strata between Coal Seams in Pillar Upward Mining of Left-Over Coal with Numerical Simulation Method
    Feng, GuoRui
    Zheng, Jing
    Liu, HongFu
    Zhong, CongMing
    ADVANCED RESEARCH ON AUTOMATION, COMMUNICATION, ARCHITECTONICS AND MATERIALS, PTS 1 AND 2, 2011, 225-226 (1-2): : 623 - 627
  • [50] Modeling and numerical optimal simulation of coal pillar's failure process on longwall leaving coal pillar mining
    Shao, Xiaoping
    Xia, Yucheng
    COMPUTER-AIDED DESIGN, MANUFACTURING, MODELING AND SIMULATION, PTS 1-2, 2011, 88-89 : 285 - +