共 50 条
- [41] Improving railway crew scheduling quality:: A hybrid approach PEACHFUZZ 2000 : 19TH INTERNATIONAL CONFERENCE OF THE NORTH AMERICAN FUZZY INFORMATION PROCESSING SOCIETY - NAFIPS, 2000, : 378 - 382
- [42] Generation Methods of Neighborhood Schedules for Practical Train Crew Scheduling Problems Using Tabu Search 2017 IEEE 10TH INTERNATIONAL WORKSHOP ON COMPUTATIONAL INTELLIGENCE AND APPLICATIONS (IWCIA), 2017, : 39 - 44
- [43] MODELLING AND SOLVING THE RAILWAY SCHEDULING PROBLEM JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY, 2014, 29 (02): : 235 - 242
- [44] Study of Crew Scheduling System for High-speed Railway ADVANCES IN COMPUTERS, ELECTRONICS AND MECHATRONICS, 2014, 667 : 72 - +
- [46] The Compilation of Intercity Railway Crew Scheduling Adapted to Daily Diagram CICTP 2020: ADVANCED TRANSPORTATION TECHNOLOGIES AND DEVELOPMENT-ENHANCING CONNECTIONS, 2020, : 2038 - 2050
- [47] An application of wedelin's method to railway crew scheduling problem IEEJ Trans. Electron. Inf. Syst., 10 (1958-1967):
- [50] Modeling and solving the crew scheduling problem of passenger dedicated line Tiedao Xuebao/Journal of the China Railway Society, 2009, 31 (01): : 15 - 19