Sequencing problem for a mixed-model assembly line in the Toyota production system

被引:31
|
作者
Kotani, S
Ito, T
Ohno, K
机构
[1] Toyota Motor Co Ltd, Corp IT Div, Aichi 4718571, Japan
[2] Nagoya Inst Technol, Dept Syst Engn, Nagoya, Aichi 466, Japan
关键词
D O I
10.1080/0020754042000270377
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The paper discusses a sequencing problem of a mixed-model assembly line in the Toyota Motor Corporation production system, which is well known as the Just-in-Time production system. Whenever a worker in the assembly line finds that he might fail to complete his operations within the work zone, he pushes a button to call an auxiliary worker who assists him in the operations. If he can complete the operations within his work zone with the help of the auxiliary worker, the line does not stop. Otherwise, the line stops. In the Toyota production system, it is very important to keep a constant rate of usage of every part used by the assembly line. Hence, there are two goals for the sequencing problem in the Toyota production system. The paper provides a new formulation for the sequencing problem with two goals. It considers the goal of keeping the constant rate of part usage as a constraint of the sequencing problem, and it formulates a sequencing problem of minimizing the total line stoppage time with auxiliary workers and the constraints for keeping the constant rate of part usage. Since this problem is NP-hard and the size of the practical problems at Toyota are huge, a two-phase approximation algorithm is proposed. Numerical examples show that the proposed algorithm is efficient and can find a good suboptimal solution.
引用
收藏
页码:4955 / 4974
页数:20
相关论文
共 50 条
  • [21] A HYBRID ELECTROMAGNETISM-LIKE ALGORITHM FOR A MIXED-MODEL ASSEMBLY LINE SEQUENCING PROBLEM
    Yan, Hong-Sen
    Jiang, Tian-Hua
    Xiong, Fu-Li
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2014, 21 (03): : 153 - 167
  • [22] A multi-objective scatter search for a mixed-model assembly line sequencing problem
    Rahimi-Vahed, A. R.
    Rabbani, M.
    Tavakkoli-Moghaddam, R.
    Torabi, S. A.
    Jolai, F.
    ADVANCED ENGINEERING INFORMATICS, 2007, 21 (01) : 85 - 99
  • [23] A hybrid electromagnetism-like algorithm for a mixed-model assembly line sequencing problem
    Yan, Hong-Sen
    Jiang, Tian-Hua
    Xiong, Fu-Li
    International Journal of Industrial Engineering : Theory Applications and Practice, 2014, 21 (03): : 153 - 167
  • [24] Mixed-model assembly line sequencing at Hyundai Motor Company
    Duplaga, Edward A.
    Hahn, Chan K.
    Hur, Daesik
    Production and Inventory Management Journal, 37 (03): : 20 - 26
  • [25] An integrated approach to mixed-model assembly line balancing and sequencing
    Uddin, Mohammad Kamal
    Cavia Soto, Marian
    Martinez Lastra, Jose L.
    ASSEMBLY AUTOMATION, 2010, 30 (02) : 164 - 172
  • [26] Mixed-model assembly line sequencing using beam search
    Erel, Erdal
    Gocgunz, Yasin
    Sabuncuoglu, Ihsan
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2007, 45 (22) : 5265 - 5284
  • [27] An imperialist competitive algorithm in mixed-model assembly line sequencing problem to minimise unfinished works
    Zandieh, M.
    Moradi, Hadi
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE-OPERATIONS & LOGISTICS, 2019, 6 (02) : 179 - 192
  • [28] Mixed-model assembly line balancing problem with tasks assignment
    Dziki, K.
    Krenczyk, D.
    MODERN TECHNOLOGIES IN INDUSTRIAL ENGINEERING VII (MODTECH2019), 2019, 591
  • [29] COMPUTATIONAL METHODS FOR THE MIXED-MODEL ASSEMBLY LINE PROBLEM - A REVIEW
    SULIMAN, SMA
    ALTAMIMI, AM
    NAWARA, GM
    JOURNAL OF ENGINEERING SCIENCES, 1985, 11 (02): : 241 - 271
  • [30] EXPERT SYSTEM MIXED-MODEL ASSEMBLY LINE SCHEDULING
    VARGAS, JE
    PISHORI, R
    NATU, R
    KEE, CJ
    EXPERT SYSTEMS WITH APPLICATIONS, 1992, 5 (1-2) : 79 - 85