共 50 条
- [2] The ISM Analysis on Influence Factors of Cost Control in the Wind Power Construction Project INTERNATIONAL CONFERENCE ON APPLIED PHYSICS AND INDUSTRIAL ENGINEERING 2012, PT A, 2012, 24 : 587 - 590
- [3] The ISM Analysis on Influence Factors of Cost Control in the Wind Power Construction Project 2010 INTERNATIONAL CONFERENCE ON COMMUNICATION AND VEHICULAR TECHNOLOGY (ICCVT 2010), VOL II, 2010, : 71 - 73
- [6] Analysis of period and cost based on reward and penalty conditions of contract for construction Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2010, 43 (06): : 139 - 145
- [8] Selection of Transaction Model for Supply Chain Based on Transaction Cost PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON LOGISTICS SYSTEMS AND INTELLIGENT MANAGEMENT, VOLS 1-3, 2010, : 1953 - +
- [10] Analysis of Affecting Factors on Power Sustainable Development Based on ISM Model 2017 3RD INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT (ICIM 2017), 2017, : 461 - 465