共 50 条
- [1] The ISM Analysis on Influence Factors of Cost Control in the Wind Power Construction Project 2010 INTERNATIONAL CONFERENCE ON COMMUNICATION AND VEHICULAR TECHNOLOGY (ICCVT 2010), VOL II, 2010, : 71 - 73
- [2] The Research On The Cost Control of Wind Power Construction Project 2011 AASRI CONFERENCE ON ARTIFICIAL INTELLIGENCE AND INDUSTRY APPLICATION (AASRI-AIIA 2011), VOL 2, 2011, : 9 - 12
- [3] Project Cost Control in Power Engineering and Construction Company TECHNICS TECHNOLOGIES EDUCATION MANAGEMENT-TTEM, 2010, 5 (04): : 740 - 748
- [5] Analysis of Factors of Construction Contract Transaction Cost Based on ISM Model PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ECONOMICS, SOCIAL SCIENCE, ARTS, EDUCATION AND MANAGEMENT ENGINEERING, 2015, 38 : 859 - 863
- [8] The Progress Influencing Factors Analysis of Thermal Power Project Based on ISM Method PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON LOGISTICS SYSTEMS AND INTELLIGENT MANAGEMENT, VOLS 1-3, 2010, : 1613 - 1617
- [9] Analysis and Discussion of the Influence Factors of the Wind Power MANUFACTURING SCIENCE AND TECHNOLOGY, PTS 1-8, 2012, 383-390 : 7595 - +
- [10] Cost analysis and risk supervision of project in electric power construction PROCEEDINGS OF THE 2016 4TH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE, EDUCATION TECHNOLOGY, ARTS, SOCIAL SCIENCE AND ECONOMICS (MSETASSE-16), 2016, 85 : 1544 - 1547