The ISM Analysis on Influence Factors of Cost Control in the Wind Power Construction Project

被引:6
|
作者
Wu Yunna [1 ]
Bian Qing [1 ]
Lin Ping [1 ]
机构
[1] N China Elect Power Univ, Sch Econ & Management, Beijing, Peoples R China
关键词
wind power construction project; cost control; interpretive structural modeling(ISM);
D O I
10.1016/j.phpro.2012.02.086
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Cost control in the wind power construction project is essential under the trend of developing wind power in China. In order to carry out cost control effectively, structural interpretation model(ISM) is used to identify and analyze the major factors that affect the implementation of cost control and the hierarchy relationships between each other. In this way, the surface causes, the middle causes and the underlying causes that affect the cost control in the wind power construction project have been found, which provides decision theory for the smooth implementation of cost control in China's current wind power construction projects. (C) 2011 Published by Elsevier B.V. Selection and/or peer-review under responsibility of ICAPIE Organization Committee.
引用
收藏
页码:587 / 590
页数:4
相关论文
共 50 条
  • [1] The ISM Analysis on Influence Factors of Cost Control in the Wind Power Construction Project
    Wu Yunna
    Bian Qing
    Lin Ping
    2010 INTERNATIONAL CONFERENCE ON COMMUNICATION AND VEHICULAR TECHNOLOGY (ICCVT 2010), VOL II, 2010, : 71 - 73
  • [2] The Research On The Cost Control of Wind Power Construction Project
    Wu Yunna
    Bian Qing
    Luo Wei
    Dong Dapeng
    2011 AASRI CONFERENCE ON ARTIFICIAL INTELLIGENCE AND INDUSTRY APPLICATION (AASRI-AIIA 2011), VOL 2, 2011, : 9 - 12
  • [3] Project Cost Control in Power Engineering and Construction Company
    Mukaca, Inela Kudumovic
    Sehic, Dzevad
    TECHNICS TECHNOLOGIES EDUCATION MANAGEMENT-TTEM, 2010, 5 (04): : 740 - 748
  • [4] Research on Influencing Factors of Cost Control of Centralized Photovoltaic Power Generation Project Based on DEMATEL-ISM
    Zhang, Jun
    Li, Jing
    You, Jiawei
    SUSTAINABILITY, 2024, 16 (13)
  • [5] Analysis of Factors of Construction Contract Transaction Cost Based on ISM Model
    Liu Hua
    Wang Yaoyao
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ECONOMICS, SOCIAL SCIENCE, ARTS, EDUCATION AND MANAGEMENT ENGINEERING, 2015, 38 : 859 - 863
  • [7] Wind Power project begins construction
    不详
    CHEMICAL ENGINEERING PROGRESS, 2001, 97 (02) : 15 - 15
  • [8] The Progress Influencing Factors Analysis of Thermal Power Project Based on ISM Method
    Chen Wenjun
    Wu Yunna
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON LOGISTICS SYSTEMS AND INTELLIGENT MANAGEMENT, VOLS 1-3, 2010, : 1613 - 1617
  • [9] Analysis and Discussion of the Influence Factors of the Wind Power
    Li, Guojian
    Hu, Yanjun
    MANUFACTURING SCIENCE AND TECHNOLOGY, PTS 1-8, 2012, 383-390 : 7595 - +
  • [10] Cost analysis and risk supervision of project in electric power construction
    Gu Zheng
    Lu Tianqi
    Ma Qiang
    PROCEEDINGS OF THE 2016 4TH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE, EDUCATION TECHNOLOGY, ARTS, SOCIAL SCIENCE AND ECONOMICS (MSETASSE-16), 2016, 85 : 1544 - 1547